Welcome to InEight Document’s Defects Module. InEight Document's Defects module facilitates the easy tracking and managing of defects that may arise through a project.
This module manages the process of building inspection lists, as well as recording and closing out defects prior to practical completion.
Features of this module include:
Defining a Project Inspection List
Recording defects against the Project Inspection List
Assign each defect to a contractor for rectification
Tracking of defects
Exporting the Project Inspection Lists and the defects
Inspecting amendments of each defect including claims the defect has been fixed
Running reports on defects; and
Resolving defects.
The following terms are associated with the Defects module in InEight Document.
Defects Register: This denotes the different templates available on a project.
Project Inspection List: An Inspection List is a work breakdown structure of elements for Inspection and Defects management.
Parent: Parent refers to an Inspection List item (i.e. Building, Area, Location, etc.) that contains subsidiary items (see Child).
Child: Child refers to an Inspection List item (i.e. Room, Item, etc.) that is a subsidiary of a Parent item.
Key Contact: A user that has access to the Defects Module that is the point of contact for Defects on the project for a particular Company.