The tools in the Viewing tools tab toolbar let you customize how you view the PDF.
| Item number | Name | Use |
|---|---|---|
| 1 | Pan hand | Click and drag to move a large drawing around in the viewing area. |
| 2 | Select text and annotations | Select existing text or annotations, so you can add or manage links or delete. |
| 3 | Zoom tools | Zoom in or out of the PDF page. |
| 4 | Marquee | Magnify an area of the page. Use the pan hand tool to move the page in the viewer. Use the Zoom out tool to return to the original size. |
| 5 | Loupe | View a magnified area of the page by hovering over it. |