InEight Document can automate the distribution of documents uploaded to the system via rule-based distribution rules which control:
The default distribution for unrestrained documents.
The format(s) of the documents each person on the distribution can download.
A user included in a distribution rule set will automatically be notified when documents meeting the rule-based criteria of the group are released in InEight Document.
Distribution rules are defined on a per attribute basis.
Click the cogwheel icon and select Admin.
Select Manage document rules.
In the Rule Type drop-down menu, select Distribution.
Click the plus icon.
Enter in the title for the distribution and select a value from the drop-down menu.
In the Distribution tab, select the company.
Select the contact and click the arrow icon.
Select the formats the contact has access to.
Select notify to send notifications to the contact for documents.
Click Save.