You can track the signature status from the Documents register or from the document's Signature status tab.
On the Documents register, the Signature status column shows the status of the document. You can click the link to go to the Signature status tab.
The document's Signature status page shows the overall status of the document along with the signees and their individual signing statuses.
Document supports the following statuses:
| Status | Description |
|---|---|
| Draft | Signatures have been partially set up and saved but not sent. |
| Sent for signature | Signatures are currently in progress. |
| Completed | Signatures have been completed and signed by all users. |
| Rejected | A user has rejected signing the document. When a user rejects to sign, the Signee status shows as Rejected. For the remaining signees who will not be able to sign, their Signee statuses are blank. The status for the document in the Signature Status tab and on the Documents register shows as Rejected. |