Create links between documents to keep them together.
Open the document.
Click the plus icon to open a new window.
Select the Module that you would like to link the item from.
Enter in the search criteria and click Search.
Select the document(s) and click the arrow icon.
Click Save.
To download documents from the Links page, select one or more documents, and then click the Download icon.
Additional Information