Add / Remove Projects

Once installed, a shortcut for the Windows standalone application is created on the user’s Desktop.

  1. Double click on the shortcut to open the application.
    Click Projects button.

  2. Projects can then be added or removed as per Windows Explorer Integration (refer to sections 3.1 and 3.2 for instructions).