Windows Integration |
Standalone Application |
|---|---|
|
Familiar Windows interface. |
Simplified register view. |
|
Ability to select project view or folder structure view. |
Grid view with clear metadata display in register. |
|
Ability to upload a single document. |
Bulk Upload available via drag and drop |
|
Ability to select which available module to synchronise. |
Documents, Published Reports and Gallery registered by default – access is inherited from the project |
|
Ability to drag and drop files from other windows applications. |
Ability to drag and drop files from other windows applications; and Seamless transfer to and from Microsoft OneDrive |
|
All settings are controlled in Application Preferences. |
Folder display format and synchronisation message display are available in Settings |