Installation Steps

  1. Once the download is complete, unzip the zip files.

  2. Double click and run the setup msi from the extracted files.

  3. Select the required option for the Installer, (Standalone, Integrated or Both) then click Next.

  4. Select the Destination Folder.

  5. Click Next once more then Install.

  6. Select option “Do not close applications. A reboot will be required.”

    Currently, if option “Close the applications and attempt to start them.” is selected, Task bar will be hidden alongside with all opened applications. We will be addressing this in a future upgrade.