Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
To download images using the iOS App:
Select the checkbox against image(s) then the Download icon from the top left of the Register.
Choose from the download size options, then press Download.
When the user selects download, the following options are available:
Small: Downloads a lower resolution of the original image with reduced file size.
Medium: Downloads a lower resolution of the original image with reduced file size.
Large: Downloads original resolution of the image but with reduced file size.
Actual Size: Downloads selected files in their original state.
Custom: Allows user to customize the download resolution.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information