Linking Project Gallery with Other Modules

To link an item from another module with a Project Gallery image:

  1. From the Image Details window click the Actions button and select Link Items.

  1. Select the relevant module from the Search criteria drop-down.

  1. Find the appropriate item(s), tick the required check boxes, click and then Save.

Linked items will be visible against the image in the Links tab in separate sections by Module.