The security controls can be further refined from the Security Group access settings.
To access the Security Group access settings, click the Admin menu and select Manage user access.
Choose Security from the drop-down then select the Project Gallery drop-down on the top right hand side.
The following list of security attributes can be configured:
Upload Picture/Video
Upload
Add New Version
Edit Attributes
Edit Details
Add Tags
Add Comments
Link
Link Mail
Link Documents/Transmittals
Link Packages
Link Project Gallery
Other
Module Attachment
Mail Attach
Document ViewFile
Transmittal Attach
Assign projects
Delete Picture/Video
Additional Information