If after clicking Add Photo the Camera Roll option is selected:
Select one or multiple images. Once selected the image greys out and a check sign appears.
Click Done (top right corner) to add the images to the app.
This opens the New Image page (the standard mobile device camera capture interface.)
Add additional metadata and select images to upload by selecting the Camera Roll or Camera buttons below the image.
Additional Information