Images can be uploaded to the Project Gallery as single files, or in bulk.
From within the Gallery register click the
button on the menu bar.
At the Upload Manager window click the
button to add one or more files.
Select the files to upload in the Upload window. They will start uploading immediately with upload progress shown next to the file name.
Once the files are uploaded, a miniature thumbnail of the uploaded image appears on the left in the Preview column.
Once all images are uploaded, they can be saved along with the associated metadata by clicking Save.
Files can be removed by clicking the Delete icon in the Upload Manager.