Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Single sign-on is configured at a Company level by people that have access to add and edit Company details. Single sign-on allows users to log into and access InEight Document with the same credentials as those used when logging into their computer or organization network.
Summary: Connect to single sign-on to let Document users sign on with the same credential as their computers or organization network.
Considerations: When single sign-on is enabled for a company, the two-factor authentication requirement is disabled for users from that company, whether enforced or opt-in.
The instructions below are for Azure set up only. For other authentication provider set up, contact the InEight support team.
Quick steps:
Go to Companies.
Click the blue underlined Company ID to open the company.
Click the Single Sign On Setup tab.
Enter the corporate domain into the Corporate domain section, an example is shown below.
Select an Authentication Provider – Azure AD.
The setup instruction hyperlink will be available to download from here:
Complete the instructions which includes entering the Application ID.
Enter the active directory name for each address book contact in the Active Directory Name field, for example, firstname.lastname@company.com.
Confirm that the contact has been added to the relevant security group.
What's next: Forward the Login using link shown at the bottom of the Single Sign-on page to Document users. They can then sign in to Document with their computer or organization credentials.
More information?
For further information, please contact InEight.
Email: support@ineight.com
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information