Generating Lot Links

To generate a lots shareable hyperlink:

  1. Select the relevant lot and click More then select Generate Lots Hyperlink.

To generate a shareable hyperlink for the current Lots Summary Register:

  1. Select Actions then Generate Hyperlink for the current Register.