Features |
Benefits |
|---|---|
|
Create and open Lots and Sub-Lots within a project- specific Lot structure. |
Easily find and access all documents related to a Lot in one place. |
|
Link RFI’s, ITP’s, Test Plans, Hold Points, Witness Points and NCR’s to Lots. |
Maintain a fully auditable history of all activities related to Lots and Sub Lots. |
|
Add supporting documents to Lots such as completed inspection checklists. |
Quickly navigate and access documents using a custom Lot structure. |
|
Update Lot status, capture Lot details and define and control management responsibilities for each lot. |
Easily monitor project progress, activities and responsibilities using project Lots. |
|
Summary and detailed Lot Management reports. |
Powerfully filtering allows the dynamic sorting and grouping of Lots with ease. |
|
Manage Security at a granular level and define Lot Status workflow. |
Ensure field processes around the Lot’s lifecycle are being reflected in the system. |