When revisions have been made to a document in a lot, you can quickly link the revisions so that the lot refers to the most recent document. If a document in a lot has a new revision, an indicator shows in the column to the left of the Lot number on the Lots register.
Click the icon to see a list of revisions. You can then select one or more revisions to link to the lot., and then click Save.