Sub Lots are typically used to break larger Lots further into smaller sub segments.
For example, a Bridge that is a Lot may be broken into smaller Sub Lots such as Piers, Abutments, Decks and Girders.
There is no limit to the number of Sub Lots that can be created under a Parent Lot.