Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
You can take a new image and add it to the gallery.
Summary: Add an image from the camera on your mobile device to the gallery. After it is added, the image is available in both the mobile and web applications.
Considerations: You must allow Document to access the camera on your device. If you have an iOS device, it is best practice to enable location services (Settings > Privacy &Security > Location Services) to ensure you are capturing the expected location data.
From the All items view of the Gallery, tap the Add image icon.
At the prompt, select Take a new image. The camera on your device opens.
Take a photo with your camera. You have the option to use the photo or retake the photo. When you have the photo you want, tap Use Photo.
Optionally use the markup tools to add simple markups.
Tap the Complete icon. The Save and link image dialog box opens.
Add detail information. The Access level field is required; the others are optional.
Tap Save. The image is added to the gallery.
You can tap the download icon to download the image to your device. You can also view details, or manage links. Refer to Manage document links for more information about links.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information