Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
You can add a link to an existing annotation on the PDF. A pin links the document, mail item, form or item in the gallery to an existing annotation.
From a PDF that is open in the viewer, tap and hold on an annotation, such as a shape or comment.
At the prompt, select either Link existing item or Link new item.
Follow the prompts to search for and select an existing item or create a new item, and then tap Link. The Manage Linked items slide-out panel opens and shows your linked item.
Tap the Save icon.
Tap on the annotation to open the Manage linked items slide-out panel to manage the linked item or add more items.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information