Add a Link to an annotation

You can add a link to an existing annotation on the PDF. A pin links the document, mail item, form or item in the gallery to an existing annotation.

  1. From a PDF that is open in the viewer, tap and hold on an annotation, such as a shape or comment.

  2. At the prompt, select either Link existing item or Link new item.

  3. Follow the prompts to search for and select an existing item or create a new item, and then tap Link. The Manage Linked items slide-out panel opens and shows your linked item.

  4. Tap the Save icon.

Tap on the annotation to open the Manage linked items slide-out panel to manage the linked item or add more items.