Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
You can add items, such as a photograph, to the gallery from your mobile device.
You must allow Document to access the photo album on your device.
From the All items view of the Gallery, tap the Add image icon.
At the prompt, select Upload images. A dialog box with the images in your photo album opens.
Select an image, and then tap Add. The Save and link image dialog box opens.
Enter the image information. The Access level field is required; the others are optional.
Tap Save. The image is added to the gallery.
What's next: You can tap the download icon to download the image to your device. You can also view details or manage links. Refer to Manage document links for more information about links.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information