You can add attachments to a form from the mobile app.
The mobile app lets you add attachments to a form without having to go back to the web browser application. You can take a photo, upload an existing image, or access files in your OneDrive, iCloud, or other storage location.
You must allow Document access to your photos or camera to attach images. When you tap Take a Photo or Upload Existing Image for the first time, you are prompted to allow Document to access your photos or camera. After you allow access, you are not prompted again.
From a form, scroll to the Attachments section, and then tap the Add icon. The Select an Option dialog box opens.
Select one of the following:
If you want to add an image, select Take a Photo or Upload Existing Image, and then follow the instructions on your device. You can skip to step 4.
If you want to add a file from storage, select More, and then continue with step 3.
A dialog box opens with recent files. You can select one of these or tap Browse to see more options. The Browse menu lets you access recent files, files in locations such as iCloud Drive or One Drive, and recently deleted files. After you find your file, tap it to add it as an attachment.
Verify that the file is added to the form.
Tap Save to save the form or Complete action to complete the form.
Additional Information