The Compare feature can be used to compare two revisions of documents that you have access to. The two documents are overlaid on each other to enable a side-by-side comparison. You can only compare two revisions.
Summary: You can compare the current document in the PDF Viewer to a previous revision without returning to the Documents register.
Considerations: You can only compare two revisions.
From a document that is opened in the viewer, tap the ellipsis menu, and then select Compare view.
A list of revisions shows.
Select another revision of the document.
The two revisions are overlaid on top of each other in the Viewer. Items shown in blue indicate the newer revision. Items shown in orange indicate the older revision. Items shown