Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
You can insert an image saved on your device into a PDF as an annotation.
You must allow Document access to your photos on your device.
From the markup tools menu, tap the Image icon.
At the prompt, select an area on the page to pin the photo.
Select Upload image to select an image from your photos.
Select an image from your photos, and then tap Add. The Save and link image dialog box opens.
Enter the title, notes, tags, and access level of the image, and then tap Save. The image is uploaded to the gallery, and the Manage linked items slide-out panel opens, indicating that the image has been added. A lens icon is added to the place you selected on the PDF page.
Tap the Complete icon.
Tap the Save icon to save the PDF.
You can tap the lens icon to return to the Manage linked items slide-out panel. See Manage document links for more information about linking items to a PDF.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information