The links function in the mail module lets you add and view links to mail from the register without having to open the mail item.
You can add a link to an existing item to mail.
Click the ellipsis in the mail line or tile.
Select Manage Links from the menu.
From the Manage linked items slide-out panel, tap Add, and then tap Link existing item. The Link existing item dialog box opens.
You can create a new item and then link it to mail.
Click the ellipsis in the mail line or tile.
Select Manage Links from the menu.
From the Manage linked items slide-out panel, tap Add, and then tap Link new item.
Tap on the annotation to open the Manage linked items slide-out panel to manage the linked item or add more items.