Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

To access mobile settings, tap the Main menu icon in the upper left corner of the application, and then select Settings. Settings include general settings and user preferences.
Tap the General tab to view the general settings.
Options area | Description |
---|---|
Clear files | Deletes downloaded files and clears all offline data. |
Download offline data over mobile data network | Option to turn on ability to download offline data over Mobile Data Network (instead of Wi-Fi). Not active by default. |
Upload offline data | Select Upload to upload data created offline into InEight Document (after an internet connection is available). |
Maximum file store on device (MB) | Update to set maximum file storage limit on device (MB). |
About InEight Document | Provides version app details, including version and build date. It also includes information about your device. |
Tap the User preferences tab to view user preferences.
Options area | Description |
---|---|
Max number of records to be downloaded | Sets the maximum number of files to be downloaded at one time. Valid amounts are 20-500. The default is 100. |
Last downloaded date | The date data was last downloaded to the device. |
Home screen view | Lets you select the page that opens after you have signed on and selected a project. You can set your home screen as Mail, Document, Gallery, or Forms. |
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information