To read mail, tap the relevant mailbox (that is Inbox or Sent mail), and then tap the mail you want to read. The mail opens. After you read the message, you can change the status, respond, or change the responded date.
To change the mail status, tap the down arrow in the status drop-down list in the top right toolbar, and then tap Save.
You can change the responded date without having to respond to the mail message. The Responded field in the top right toolbar lets you change and save the date you responded to the mail.
You can reply, reply all, or forward a mail message. Tap the Respond button in the bottom toolbar, and then select an option. When you respond to a message you can also change the responded date in the message.