Outlook Integration General Settings

The following settings can be adjusted from this tab:

  1. Disable Expect: 100-continue headers – Enable this option to fix connection issues between InEight Document Outlook Integration and the InEight Document server caused by the 100-expect-continue and keep-alive headers.

  2. Mark as Unread all downloaded mails – All downloaded unregistered mails will be marked as unread when enabled.

  3. Sync Changes to downloaded mails – if this is not enabled the status changes within InEight Document to previously downloaded mails will not be updated in Outlook.

  4. Sync Response required by date from InEight Document – If ticked this will enable the “Response Required By” date in Outlook. (This is ticked by default).

  5. Do not download mail or transmittal attachments – Does not download any attachments in Outlook.

  6. Download mail or transmittal attachments equal or less than (KB) – Will only download attachments equal or less than a specified size.

  7. Use Default Browser to Open InEight Document Items – When setting is enabled, and an internet connection is available, items opened in InEight Document (by using “Open in InEight Document” button) will be opened as a new window/tab in the user’s default browser.