Offline Access and Mail Creation

If there is no internet connectivity or Outlook is in offline mode, new mail cannot be sent or received from InEight Document. However, existing mail already synchronized with Outlook can be accessed and offline drafts created (although not with the InEight Document specific fields) and stored in an offline folder. This draft is then sent through InEight Document once connectivity is regained and after the final draft is completed.

For more information, see the link below.