Standard packages received within InEight Document are stored in the Inbox folder of the Packages module. The package notification will be sent as an email to the recipients and is also stored as an incoming transmittal in the Transmittals Inbox folder.
To view the package details screen, open the package from the Inbox folder.
Details: This tab contains all the details on the package.
Documents: This tab contains all the documents attributed to the package.
Recipients: This tab contains a list of recipients for the package.
Links: This tab contains a list of any linked items to the package.
Transmittal History: This tab contains a history of incoming notifications (transmittals) that relate to the package.
Package Security: This tab contains a list of recipients and their access level to the package.