Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
|
Report No. |
Title |
Description |
|---|---|---|
|
001 |
Details - by Document |
This report is a simple register of all documents with options to include all revisions, only the latest revisions etc. This report is subject to the document access rules of the user running the report. |
|
015 |
Summary Report - by Status and Revision |
This is a powerful cross tabulation of the number of documents uploaded each period (e.g. Month) to InEight Document by Revision and Status. On the Y access each Revision + Status combination is listed. On the X axis the number of documents uploaded at that Revision and Status combination for each period is detailed. Search options provided when running this report include:
|
|
020 |
Document Access Details – By Document |
Lists user access (including formats) by document. |
|
025 |
Document Access Details – By User |
Lists document access (including formats) by user. |
|
060 |
Discipline Matrix Unassigned Users |
Lists by discipline, users who are NOT part of the default distribution matrix. |
|
075 |
Document Comments – by Document |
Lists the text comments made against each document in the Document Register. |
|
080 |
Deleted Documents – by Document |
Lists all documents that have been deleted. |
|
090 |
View Files – Download History |
Allows users to generate a report of View Files downloaded from the InEight Document system across a date range. The report includes who downloaded each View File and the date downloaded. |
|
100 |
Transferred Documents Report |
This report lists all documents that have been processed into the current document via the Unregistered mail option Process Transmittal as Document. |
|
110 |
Replace / Remove View Files History |
Lists all View Files that have been replaced or removed from documents. |
|
120 |
Document Linked – Items |
Lists all documents that have links to other items including links, associated module(s) and reference number. |
| 250 | Document Register - by File name | Lists documents with an additional column for the file name. |
|
G001 |
Graphical Report |
This report represents information as a histogram. |
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information