Manage comments

The Comments tab lets you manage comments for both documents and submittals. You can also use the tab to add, delete, download, or export comments.

The comments tab is a consolidated list of all comments related to the submittal documents. The newest comment is at the top of the list.

Number Name Description
1 Toolbar

The following tools are available:

Download comments

Add a comment at the submittal level

Duplicate a comment

Delete a comment

Export a comment to a Microsoft Excel file

2 Attachments A paperclip icon indicates that there is an attachment to the comment. Click the icon to download the attachments.
3 Document No. The number of the document for the comment. If there is no document number the comment was made at the submittal level.
4 Comments The comment text. If the comment display is truncated, click the View more link to see the full comment.
5 Closed out Lets you close out the comment.
6 Pagination Lets you switch between pagination and virtual scrolling views.