Transmittals that have been created and saved are stored in the Drafts folder until they are sent or deleted.
Click the Module drop-down menu.
Select the transmittal.
Edit the transmittal details.
Click Send.
Printed drafts will display DRAFT at the top of the page and do not have a transmittal number. The transmittal number is assigned after the transmittal is sent.
If a document in a drafted transmittal is revised prior to the transmittal being sent, the superseded document will automatically be removed from the transmittal. The user will be notified when opening the drafted transmittal.