Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
Vendor Documents are submitted in the same way all other documents are uploaded in InEight Document.
For more information about uploading documents to Document, see Uploading a Single Document and Uploading Documents in Bulk.
The options are:
Single Document upload
Bulk Upload (standard and enhanced)
XL-Upload
If Vendor documents are uploaded using Single Document Upload (or accessed after upload is complete from the Document Register), they can be linked to one or more Deliverable Line Items.
From the document details window, go to the Links tab, then press the Add icon.
At the Link Deliverable Line Item window select the Contract Number and Item ID and then select one or more Deliverable Line Items to link to the document.
If using XL-Upload (with the Vendor Data module enabled), when the Deliverable Line Items cell is selected, it brings up a selection window as shown below. The Deliverable Line Items that each document relates to can be defined within the XL-Upload work sheet by entering them as a comma separated list into the Deliverable Line Items column. They will be validated in the normal way. Note that this column will not show if the project does not have the Vendor Data module enabled or the user does not have access to this module.
The Upload Rule for the Vendor can be set up, so that all documents uploaded by the Vendor are automatically sent to the Holding Area. See Item 8.4 for more information.
If the Contract, Item Purchased or Deliverable have only one item in the dropdown, it will be automatically selected.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information