Welcome to InEight Document. This video demonstrates how to upload a new document.
Click New, then Document. Watch as I enter all the mandatory details for a new architectural floor plan for level two. Enter the document number, the title, the revision, the status as issued for information, discipline, category, and document type.
To upload the file, click here to attach or drag and drop the file.
The uploaded file can now be found here.
Once saved, the document can be found in the document register.
Well, that's how to upload a new document. Thanks for watching.
If the document is rejected, only the document uploader will be notified, so they can make required changes before re-uploading.
Well, that's how to manage review and approval workflows.
Thanks for watching.