XL-Upload Restrictions

An XL-Upload spread sheet can be saved at any time to ensure information is not lost. It is important that when doing so, you select Save As from the File option of the Menu Bar to not overwrite the original file. Provided the spread sheet you are saving is located in the same folder as the original installation location, XL-Upload will work as normal.