Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information

The License Server Activator utility lets you to activate or re-activate your Estimate license on the Estimate License Server.
The License Server Activator can be accessed by going to C:\Program Files\InEight\InEight Estimate License Server.
Then scroll down and select LicenseServerActivator.
Each user who synchronizes a Timesheet Collector claims a license. The Timesheet Integration License Utility lets you release a Timesheet Collector user licenses. Then the license can be claimed by a different user.
The Timesheet Integration License Utility can be accessed by going to C:\Program Files\InEight\InEight Estimate. Then, scroll down and select TimesheetIntegrationLicenseUtility.
The Detach Utility lets you select which databases to detach. Use this utility when archiving the BidMaster and Library and during migrations.
The Detach Utility can be accessed by going to C:\Program Files\InEight\InEight Estimate. Then, scroll down and select DetachUtility.
The Detach Utility lets you detach all databases without the option to select which databases to keep attached. Use this utility during migrations.
The Detach Utility can be accessed by going to C:\Program Files\InEight\InEight Estimate. Then, scroll down the page and select DetachAllSilent.
The SQL Server Utility has a multitude of purposes. This utility can set trace flags which allows file permissions to remain the same and not reset when detaching databases. You can also create the BidBuildUser login if it does not already exist. To create a new login, Mixed Mode needs to be enabled.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information