Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
From the Backstage View, you can access system settings. System settings contain options and settings that effect the entire InEight Estimate system. These settings include:
General settings (options)
Network settings
Attachment settings
Licensing information and settings
Currency settings
The following step by step walks you through configuring general settings (options).
With InEight Estimate open, click on the File tab to go to the Backstage view.
Select Settings.
Select General under Options in the node tree on the left.
To activate Prompt to Save, select the Prompt to Save checkbox.
Select how often you want to be prompted (in minutes).
Select Decimal Precision in the tree on the left.
Review the default settings.
Units of Measure will default to English, and Currency will default to U.S. Dollar.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information