Plan 23.6 Release Notes

  • New EWP field – You can now add an engineering work package (EWP) from InEight Design. ClosedRead more

The Engineering work package (EWP) field was added to the construction work package (CWP) overview. This is a new integration between InEight Design and Plan that lets you see the engineering schedules. To add an EWP, select the Add icon in the Work packaging menu, and then select Engineering work package-EWP.

The Add EWPs from project search dialog box opens, and you can select one or more available EWPs to associate with a construction work package (CWP).

After they are added, the linked Engineering work package (EWP) shows in the associated work package.