Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
General release is available starting 25-AUG-2025.
*Updated 16-SEP-2025
(Breaking change) SelfService.vwContractDocumentSignWorkflowHistory – The ExpireDateTime, DeliveredDateTime, and SignedDateTime fields have been deprecated in this release. In Release 25.1, data was removed from these fields. The following fields should be used instead: ExpireDate, DeliveredDate, and SignedDate.
(Breaking change) SelfService.vwContractPayFormPaymentRequest and SelfService.vwContractPaymentClaim views – The WorCompletedThroughDate field has been deprecated in these views. The WorkCompletedThroughDate field was added to these views in Release 25.5 to replace the WorCompletedThroughDate field.
(Breaking change) SelfService.vwContractCCOSummary – The ControlChangeRegisterID field has been converted to a decimal data type.
(Breaking change) SelfService.vwControlCurrentBudget – Current Budget records are not assigned a unit of measure in the system, and the data in this table was incorrect. In this release, the data in this column has been replaced with null values. In Release 25.9, the field will be deprecated.
*(Breaking change) Explore.vwDesignEngineeringCBSManhourSpread view – The PlannedMHrs and CurrentMHrs fields have been added to the view. The CEPlannedMHrs and CECurrentMHrs fields remain in the view but the values are null in this release and will be removed in Release 25.9.
(Breaking change) Explore.vwDesignPlanScheduleActivity – For performance reasons, the primary key in this view has been changed to ComponentClaimingSchemeStepId in this release.
*(Breaking change in Release 25.9) UnitOfMeasure field deleted - The data in this field contains only null values in Release 25.7, and in Release 25.9 the field will be removed from the SelfService.vwControlCurrentBudget and Explore.vwControlCurrentBudget views.
*(Breaking change in Release 25.9) SelfService.vwContractDetails - This view it is redundant to the SelfService.vwContractDetail view and will be removed in Release 25.9.
*(Breaking change in Release 25.9) Explore.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, CurrentEstimateMHrsPerScopeItemStep, and MaxCEMH will be removed from the view in Release 25.9.
*(Breaking change in Release 25.9) SelfService.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, and CurrentEstimateMHrsPerScopeItemStep will be removed from the view in Release 25.9.
InEight Billings – The new views SelfService.vwBillingsBillingsProjectPayItem and SelfService.vwBillingsBillingsProjectWorkOrder have been added for Billings.
InEight Control – The new views Explore.vwControlTimePhasedCostItem and SelfService.vwControlTimePhasedCostItem have been added for Control.
SelfService.vwBillingsBillingsEquipment – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsLabour – New fields for LocationCode and Billings ProjectWorkOrderID have been added to this view.
SelfService.vwBillingsBillingsLineItem – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsMaterial – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsProjectWBS – A new field for BillingsProjectPayItemID has been added to this view.
SelfService.vwCompletionGeneralHeaderData – New fields have been added to this view for the following:
Read more
SelfService.vwComplianceGeneralHeaderData – New fields have been added to this view for the following:
Read more
SelfService.vwContractChangeWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this view.
SelfService.vwContractContractWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this view.
SelfService.vwContractPayform – The calculation for the DueDate field has been changed from first invoice date per payform + duedays, to minimum invoice date per payform + duedays. In addition, new fields for CreatedById, ModifiedById, and ModifiedByName have been added to this view.
SelfService.vwControlChangeOrder and Explore.vwControlChangeOrder – New fields have been added to these views for:
Read more
SelfService.vwControlCostItemEstimatedResource – A new field for ProjectId has been added to this view.
SelfService.vwCoreUnitOfMeasure – A new field for IsActive has been added to this view.
SelfService.vwCoreUser – New fields for CalculatedAsOfTimestamp and Email have been added to this view.
SelfService.vwScheduleSchedule – A new field for CriticalActivityDuration has been added to this view.
SelfService.vwScheduleScheduleIntervalEvent – New fields for ActualUnits and RemainingUnits have been added to this view.
SelfService.vwScheduleScheduleIntervalStep – New fields for ActualUnits, AtCompleteUnits, and RemainingUnits have been added to this view.
SelfService.vwScheduleScheduleWorkBreakdownStructure – A new field for IsBottomUpCost has been added to this view.
CalculatedAsOfTimestamp – The CalculatedAsOfTimestamp field has been added to the following views:
Read more
SelfService.vwComplianceGeneralHeaderData – The LastCompletedDate field has been added to the view and should be used in place of the FinishDate field.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information