General release is available starting 02-MAR-2026.
*Updated 26-FEB-2026
**Updated 19-MAR-2026
(Breaking change) SelfService.vwEstimateResourceCost – Fields in this view have been renamed.
ResourceCostsId has been renamed to EstimateResourceCostId
ResourceCostsUF has been renamed to EstimateResourceCostUF
EstimateResourceCostsUID has been renamed to EstimateResourceCostUID
(Breaking change) SelfService.vwEstimateResourceCostsReferencedData – Fields in this view have been renamed.
Read more
(Breaking change) SelfService.vwEstimateResourceCostsCalculatedValue – Fields in this view have been renamed.
Read more
*(Breaking change in Release 26.3) InEight Contract precision change – The precision of all decimal data types will be updated to (28,15) or (38, 15) in the following Contract views:
Read more
**(Release 26.3) InEight Estimate view conversions - Currently, Estimate Explore and SelfService views report numeric values in the base currency or unit of measure. In Release 26.3 all fields that report amounts, quantities, or cost will be converted to match units of measure and currencies as shown in the Estimate (Cloud) user interface. The list of views and fields that are impacted is available in the Estimate View Changes document.
InEight Contract – The new view SelfService.vwContractChangeOrderStatusSummary has been added for Contract.
*SelfService.vwContractContract – New fields for CreatedById, DefaultRetentionPercent, ContractRetentionPercent, Incoterm, and PaymentTerm have been added to this view.
SelfService.vwCoreAccountCode – A new field for GeneralNotes has been added to this view.
SelfService.vwDesignDocument – The field string lengths have been updated in this view for DocumentName from 200 to 254 and for DocumentNumber from 100 to 200.
SelfService.vwPlanQuantityClaim – New fields for UOMId and UOMName have been added to this view.
New fields in InEight Platform views – New fields for SourceSystemId and SourceSystemName have been added to these views:
Read more
*New fields in Schedule views – New fields for CreatedById, CreatedDate, ModifiedById, ModifiedDate, and IsActive have been added to the following views:
Read more
General release is available starting 29-DEC-2025.
*Updated 27-JAN-2026
(Breaking change) Explore.vwCoreEquipment and SelfService.vwCoreEquipment – As a result of changes to the product, the data in the EquipmentStatusId, EquipmentStatusName, and EquipmentStatusDescription fields only show as null values in these views.
*(Breaking change) SelfService.vwControlBudget – As a result of tool compatibility with parenthesis, these fields in the view have been renamed.
Read more
(Breaking change) Explore.vwBIDesignQuantityItem – In this release, the DeletedAttributes and WBSConflicts fields show as null values in this view.
(Breaking change) InEight Design deprecated views – In this release, the following views have been removed for Design:
Read more
InEight Estimate – The new view Selfservice.vwEstimateWorkersCompValuesReferencedData has been added for Estimate.
InEight Plan – The new view SelfService.vwPlanDailyPlanClaimingStep has been added for Plan.
New schema created in Replicate – A new schema is offered in Replicate for views that only exist in Replicate and do not have a corresponding API.
Read more
Explore.vwContractDetailTax – A new field for IncludeInCommittedCost has been added to this view.
SelfService.vwContractCostItemPricingDetail – A new field for ValueTypeId has been added to this view.
SelfService.vwContractContractDocument – New fields for VendorContractDocumentStatusId and IsVendorPortal have been added to this view.
SelfService.vwContractPaymentClaim – A new field for ActualToDateCertified has been added to this view.
SelfService.vwControlAuditLogImportHistoryRegister – A new field for TransactionId has been added to this view.
Explore.vwPlanWeeklyTimeSheet – A new field for ModifiedDate has been added to this view.
SelfService.vwPlanDailyPlanHoursResourceVersion – The following new fields have been added to this view.
Read more
SelfService.vwContract – As a result of changes to the product, the format of the RemainingToBuy field is increasing from DECIMAL(16,5) to DECIMAL(21,5).
SelfService.vwContractDetail – A new field for IsActive has been added to the view.
InEight Plan enhanced views – Performance improvements have been made to the SelfService.vwDailyPlanSummary, SelfService.vwPlanComponentCharacteristic, SelfService.vwPlanQuantityClaim, and SelfService.vwPlanTimeCards views.
General release is available starting 27-OCT-2025.
*Updated 29-OCT-2025 **Updated 03-DEC-2025
(Breaking change) SelfService.vwContractDetails - This view it is redundant to the SelfService.vwContractDetail view and has been deprecated in this release.
(Breaking change) SelfService.vwCCOSummary – The data type for the RequestedExtensionDays field has been changed from Integer to Decimal in this release.
(Breaking change) SelfService.vwIssueSummary - The data type for the DelayDays field was changed from Integer to Decimal.
(Breaking change) SelfService.vwContractCCODetail - The data type for the RequestedExtensionDaysContract, RequestedExtensionDaysForecast, ApprovedExtensionDaysContract, and ApprovedExtensionDaysForecast fields have been changed from Integer to Decimal in this release.
(Breaking change) SelfService.vwContractPCODetail - The data type for the RequestedExtensionDaysContract, RequestedExtensionDaysForecast, ApprovedExtensionDaysContract, and ApprovedExtensionDaysForecast fields have been changed from Integer to Decimal in this release.
(Breaking change) UnitOfMeasure field deleted - The data in this field contains only null values and has been removed from the SelfService.vwControlCurrentBudget and Explore.vwControlCurrentBudget views.
(Breaking change) SelfService.vwDesignDocument – The DocumentStatusChangeDate field is no longer populated by the application team, therefore no new data will flow into this field. This field now shows a null value for all new records in the table.
(Breaking change) Explore.vwDesignEngineeringCBSManhourSpread - The fields CEPlannedMHRs and CECurrentMHs have been removed from the view in this release.
(Breaking change) Explore.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, CurrentEstimateMHrsPerScopeItemStep, and MaxCEMH have been removed from the view in this release.
(Breaking change) SelfService.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, and CurrentEstimateMHrsPerScopeItemStep have been removed from the view in this release.
(Breaking change) InEight Plan deprecated views – The following views have been deprecated in this release for Plan.
Read more
(Breaking change) SelfService.vwScheduleScheduleRegisterEventProbability – In this view the field ScheduleId can now have a null value.
**(Breaking change in Release 25.11) Explore.vwCoreEquipment and SelfService.vwCoreEquipment - As a result of changes to the product, in Release 25.11 the data in the EquipmentStatusId, EquipmentStatusName, and EquipmentStatusDescription fields will only show as null values in these views.
*(Breaking change in Release 25.11) Explore.vwBIDesignQuantityItem - In Release 25.11, the DeletedAttributes and WBSConflicts columns will only show null values.
*(Breaking change in Release 25.11)InEight Design deprecated views - In Release 25.11, the following views will be removed for Design.
Read more
InEight Contract –The new views, Explore.vwContractChangeIssueCustomGroupElement and SelfService.vwContractChangeIssueCustomGroupElement have been added for Contract.
InEight Estimate - The following new views have been added for Estimate.
Read more
InEight Schedule – The new views, SelfService.vwScheduleScheduleIntervalResource and SelfService.vwScheduleSchedulePlanningPackageLogicLink have been added to Schedule.
SelfService.vwBillingsBillingsBatch – A new field for Description has been added to this view.
SelfService.vwBillingsBillingsLineItem – A new field for InvoiceNum has been added to this view.
Selfservice.vwContractDetail – A new field for ContractId has been added to this view.
Selfservice.vwContractDocument – New fields for IsPlaceholderDocument and PlaceholderDocument have been added to this view.
SelfService.vwPricingProposal – The IsUnassignedItem field has been added to this Contract view in this release.
SelfService.vwContractVendorChangeOrder - A new field for Comments has been added to this view.
*SelfService.vwControlCostItemUserDefinedTags - A new field for OptionalCode has been added to this view.
Explore.vwCoreEmployee and SelfService.vwCoreEmployee - New fields for EmployeePIN, DefaultCostCenterSourceSystemId, and UnionSourceSystemId have been added to these views.
SelfService.vwCoreEquipment – A new field for StandbyUnitCost has been added to the view.
SelfService.vwCoreProjectEquipment – A new field for IsOverridenRate has been added to the view.
Explore.vwDesignEngineeringScopeItemClaimingSchemeStep - A new field for ScopeItemClaimingStepDetailId has been added to this view and is to be used as the Primary Key replacement.
SelfService Estimate views - All SelfService Estimate views that are suffixed with CalculatedValue or ReferenceData now include fields for the Base Table Primary Key (Id) and Unique Identifier (UID) if the view previously did not have them. This allows joining between the tables by the Primary Key.
Read more
*SelfService.vwScheduleScheduleRegisterEvent - A new field for ScheduleRegisterEventTypeId has been added to the view.
General release is available starting 25-AUG-2025.
*Updated 16-SEP-2025
(Breaking change) SelfService.vwContractDocumentSignWorkflowHistory – The ExpireDateTime, DeliveredDateTime, and SignedDateTime fields have been deprecated in this release. In Release 25.1, data was removed from these fields. The following fields should be used instead: ExpireDate, DeliveredDate, and SignedDate.
(Breaking change) SelfService.vwContractPayFormPaymentRequest and SelfService.vwContractPaymentClaim views – The WorCompletedThroughDate field has been deprecated in these views. The WorkCompletedThroughDate field was added to these views in Release 25.5 to replace the WorCompletedThroughDate field.
(Breaking change) SelfService.vwContractCCOSummary – The ControlChangeRegisterID field has been converted to a decimal data type.
(Breaking change) SelfService.vwControlCurrentBudget – Current Budget records are not assigned a unit of measure in the system, and the data in this table was incorrect. In this release, the data in this column has been replaced with null values. In Release 25.9, the field will be deprecated.
*(Breaking change) Explore.vwDesignEngineeringCBSManhourSpread view – The PlannedMHrs and CurrentMHrs fields have been added to the view. The CEPlannedMHrs and CECurrentMHrs fields remain in the view but the values are null in this release and will be removed in Release 25.9.
(Breaking change) Explore.vwDesignPlanScheduleActivity – For performance reasons, the primary key in this view has been changed to ComponentClaimingSchemeStepId in this release.
*(Breaking change in Release 25.9) UnitOfMeasure field deleted - The data in this field contains only null values in Release 25.7, and in Release 25.9 the field will be removed from the SelfService.vwControlCurrentBudget and Explore.vwControlCurrentBudget views.
*(Breaking change in Release 25.9) SelfService.vwContractDetails - This view it is redundant to the SelfService.vwContractDetail view and will be removed in Release 25.9.
*(Breaking change in Release 25.9) Explore.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, CurrentEstimateMHrsPerScopeItemStep, and MaxCEMH will be removed from the view in Release 25.9.
*(Breaking change in Release 25.9) SelfService.vwDesignEngineeringScopeItemClaimingSchemeStep - The fields CEMHRs, CurrentEstimateUnitRateMH, and CurrentEstimateMHrsPerScopeItemStep will be removed from the view in Release 25.9.
InEight Billings – The new views SelfService.vwBillingsBillingsProjectPayItem and SelfService.vwBillingsBillingsProjectWorkOrder have been added for Billings.
InEight Control – The new views Explore.vwControlTimePhasedCostItem and SelfService.vwControlTimePhasedCostItem have been added for Control.
SelfService.vwBillingsBillingsEquipment – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsLabour – New fields for LocationCode and Billings ProjectWorkOrderID have been added to this view.
SelfService.vwBillingsBillingsLineItem – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsMaterial – A new field for BillingsProjectWorkOrderID has been added to this view.
SelfService.vwBillingsBillingsProjectWBS – A new field for BillingsProjectPayItemID has been added to this view.
SelfService.vwCompletionGeneralHeaderData – New fields have been added to this view for the following:
Read more
SelfService.vwComplianceGeneralHeaderData – New fields have been added to this view for the following:
Read more
SelfService.vwContractChangeWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this view.
SelfService.vwContractContractWorkflow – New fields for RecalledById and WorkflowInstanceId have been added to this view.
SelfService.vwContractPayform – The calculation for the DueDate field has been changed from first invoice date per payform + duedays, to minimum invoice date per payform + duedays. In addition, new fields for CreatedById, ModifiedById, and ModifiedByName have been added to this view.
SelfService.vwControlChangeOrder and Explore.vwControlChangeOrder – New fields have been added to these views for:
Read more
SelfService.vwControlCostItemEstimatedResource – A new field for ProjectId has been added to this view.
SelfService.vwCoreUnitOfMeasure – A new field for IsActive has been added to this view.
SelfService.vwCoreUser – New fields for CalculatedAsOfTimestamp and Email have been added to this view.
SelfService.vwScheduleSchedule – A new field for CriticalActivityDuration has been added to this view.
SelfService.vwScheduleScheduleIntervalEvent – New fields for ActualUnits and RemainingUnits have been added to this view.
SelfService.vwScheduleScheduleIntervalStep – New fields for ActualUnits, AtCompleteUnits, and RemainingUnits have been added to this view.
SelfService.vwScheduleScheduleWorkBreakdownStructure – A new field for IsBottomUpCost has been added to this view.
CalculatedAsOfTimestamp – The CalculatedAsOfTimestamp field has been added to the following views:
Read more
SelfService.vwComplianceGeneralHeaderData – The LastCompletedDate field has been added to the view and should be used in place of the FinishDate field.
General release is available starting 23-JUN-2025.
*Updated 22-JUL-2025
(Breaking change) Fields removed in InEight Estimate views - Fields in the following views have been removed in the source database and no longer report data through the SelfService views. The fields will remain in the data contract but will not populate with any data.
Read more
(Breaking change in Release 25.7) Explore.vwDesignEngineeringCBSManhourSpread view – Two fields, PlannedMHrs and CurrentMHrs, have been added to the view in Release 25.5 to replace the existing CEPlannedMHrs and CECurrentMHrs fields. In Release 25.7, the CEPlannedMHrs and CECurrentMHrs fields will remain in the view but the values will be null.
(Breaking change in Release 25.7) SelfService.vwContractPayFormPaymentRequest and SelfService.vwContractPaymentClaim views – The WorkCompletedThroughDate field has been added to the views in Release 25.5 to replace the WorCompletedThroughDate field. In Release 25.7, the WorCompletedThroughDate field will be deprecated in the views.
*(Breaking change in Release 25.7) Explore.vwDesignPlanScheduleActivity - For performance reasons, in Release 25.7 the primary key on this view will be changed to ComponentClaimingSchemeStepId.
*(Notification of removal in Release 25.7) SelfService.vwContractDocumentSignWorkflowHistory - Data was removed from the ExpireDateTime, DeliveredDateTime, and SignedDateTime fields in Release 25.1. In Release 25.7, these fields will be removed. The following fields should be used instead: ExpireDate, DeliveredDate, and SignedDate.
*(Notification of change in Release 25.7) SelfService.vwControlCurrentBudget - Current Budget records are not assigned a unit of measure in the system and the data in this table was incorrect. The data in this column will be replaced with null values in Release 25.7, and the field will be removed in Release 25.9.
*(Notification of data type change in Release 25.7) SelfService.vwContractCCOSummary - The ControlChangeRegisterID field will be converted to a decimal data type in Release 25.7.
Deprecated InEight Plan views – These views have been removed due to the consumption of Project Structures/Project Values data in Plan and have been deprecated in this release. For the new data, refer to the SelfService.vwPlanComponentCustomGroupElement view.
Read more
Deprecated legacy InEight Schedule views – These legacy Schedule views have been blank since Release 23.6 when the Schedule platform was migrated and have been deprecated in this release.
Read more
Other deprecated views – These additional views have been deprecated in this release.
Read more
SelfService.vwControlCurrentEstimate view – The list of fields were added to the view in error and to avoid any performance degradation have been removed in this release. All the impacted fields, except ProjectStatusId can already be found in the SelfService.vwControlCurrentEstimateExtended view.
Read more
InEight Contract views – The new SelfService views, SelfService.vwContractChangeStatusHistory and SelfService.vwContractContractDetailManualAdjustment have been added for Contract.
InEight Platform views – The new SelfService views, SelfService.vwCoreOrganizationBridge and SelfService.vwCoreRole have been added for Platform.
InEight Estimate views updated fields – The fields in the following Estimate views have been updated to calculate quantity based on the UOM factor.
Read more
*SelfService.vwControlChangeOrder - New fields for ApprovalProbability, RevenueChangeStatusId, and RevenueChangeStatusName have been added to the view.
Explore.vwCoreProjectUserRole – The new field IsOrganzationLevel has been added to the view.
Explore.vwCoreRoleAction – The new field Blade was added to the view to indicate the associated permissions blade in the Roles and Permissions interface.
General release is available starting 21-APR-2025.
Updated 28-APR-2025
(Breaking change) Field type change in InEight Contract/Change views – As a continuation to standardize the data types of date fields, the field type of the CreatedDate field has been changed from DateTime to DateTimeOffset in the SelfService.vwCCOSummary and SelfService.vwPCOSummary views.
(Breaking change) Field type change in InEight Compliance and InEight Completions views – To improve performance, the field type of the InspectActivityResponseId field has been changed from NVARCHAR to BigInt in the SelfService.vwComplianceCurrentEventTaskData and SelfService.vwCompletionCurrentEventTaskData views.
(Breaking change in Release 25.5) Fields removed in InEight Estimate views - Fields in the following views will be removed in the source database and will no longer report data through the SelfService views. The fields will remain in the data contract but will not populate with any data.
Read more
(Release 25.5) Deprecated InEight Plan views – The SelfService.vwPlanComponentConfiguration, SelfService.vwPlanComponentConfigurationValue, SelfService.vwPlanProjectComponentPartialView, and Explore.vwPlanComponentConfigurationValue views do not report any data due to the consumption of Project Structures/Project Values data in Plan and will be deprecated in Release 25.5. For the new data, refer to the SelfService.vwPlanComponentCustomGroupElement view.
Field type change in InEight Control view – As a continuation to standardize the data types of date fields, the field type of the CreatedDate and ModifiedDate fields have been changed from DateTime to DateTimeOffset in the SelfService.vwControlRevenueSnapshot.
PrimaryKey fields name change in InEight Estimate view – The PrimaryKey (PK) fields in the SelfService.vwEstimateResourceCostsCalculatedValue view have been changed from ResourceCostsCalculatedValuesId and ResourceCostsCalculatedValuesUF to EstimateResourceCostsCalculatedValuesId and EstimateResourceCostsCalculatedValuesUF.
Field length change in InEight Design view – To improve performance, the PrimaryKey field EngineeringCBSManhourSpreadId string length in the Explore.vwDesignEngineeringCBSManhourSpread view has been changed to 100.
InEight Completions views – The new SelfService views, SelfService.vwCompletionsEventTaskDataDaily and SelfService.vwCompletionsGeneralHeaderDataDaily have been added for Completions.
InEight Compliance views – The new SelfService views, SelfService.vwComplianceEventTaskDataDaily and SelfService.vwComplianceGeneralHeaderDataDaily have been added for Compliance.
InEight Contract views – The following new SelfService views have been added for Contract:
Read more
InEight Platform view – The new SelfService view SelfService.vwCoreProjectFuelType has been added for Platform.
SelfService.vwBillingsBillingsRateItemUnit – The new fields CreatedById, CreatedDate, ModifiedById, and ModifiedDate have been added to the view.
SelfService.vwCompletionOBSData – The new field OrganizationName has been added to the view.
SelfService.vwContractContractDocument – The new field TaxVerificationNumber has been added to the view.
SelfService.vwContractDiversityCategory – The new field Percentage has been added to the view and the string length of the Value fields has been increased from 50 to 500.
SelfService.vwIssueSummary – The new fields ChangeIssueSource have been added to the view.
SelfService.vwContractPackageDocument – The new field TaxVerificationNumber has been added to the view.
Explore.vwControlChangeOrderTimePhasedBudgetDetail – The new field ControlFiscalYearAccountingPeriodId has been added to the view.
SelfService.vwControlCostItem – The new field UnitOfMeasureName has been added to the view.
SelfService.vwControl ChangeOrderTimePhasedBudgetDetail – The new field ControlFiscalYearAccountingPeriodId has been added to the view.
SelfService.vwCoreProjectEmployeeBillingClass – The new field IsAvailable has been added to the view.
SelfService.vwCoreProjectEquipmentBillingClass – The new field IsAvailable has been added to the view.
Explore.vwDesignEngineeringCBSManhourSpread – The new fields PlannedMhrs and CurrentMhrs have been added to the view.
Explore.vwDesignEngineeringScopeItemClaimingSchemeStep – The new fields PlannedMhrs, CurrentMhrs, PlannedMHrsPerScopeItemStep, and MaxPlannedMH have been added to the view.
Explore.vwDesignQuantityItemComponent – The new field IsAssociated has been added to the view.
Explore.vwDesignScopeItemDocument – The new field DocumentErrorCode has been added to the view.
SelfService.vwDesignEngineeringScopeItemClaimingSchemeStep – The new fields PlannedMhrs, CurrentMhrs, PlannedMHrsPerScopeItemStep, and MaxPlannedMH have been added to the view.
SelfService.vwDesignClaimingScheme – The new field IsAvailable has been added to the view.
SelfService.vwDesignDesignQuantityItemComponent – The new field IsAssociated has been added to the view.
SelfService.vwDesignDeliverablePackageSummary – The new field PlannedMhrs has been added to the view.
SelfService.vwDesignEngineeringDocumentSummary – The new field PlannedMhrs has been added to the view.
SelfService.vwDesignEngineeringWorkPackageSummary – The new field PlannedMhrs has been added to the view.
SelfService.vwDesignScopeItem – The new field IsScopeLocked has been added to the view.
SelfService.vwDesignScopeItemDocument – The new field DocumentErrorCode has been added to the view.
General release is available starting 17-FEB-2025.
Updated 24-FEB-2025
InEight Estimate views deprecated fields - In the following Estimate views, the listed fields no longer provide updated data and have been deprecated. The data in these fields is currently available in InEight Platform views.
Read more
InEight Plan Project Structures/Project Values – The Plan views SelfService.vwPlanComponentConfiguration, SelfService.vwPlanComponentConfigurationValue, SelfService.vwPlanProjectComponentPartialView, and Explore.vwPlanComponentConfigurationValue no longer report any data due to the consumption of Project Structures/Project Values data in Plan and will be deprecated in Release 25.5. For the new data, refer to the SelfService.vwPlanComponentCustomGroupElement view.
Deprecated SelfService.vwEstimateResourceCostsCalculatedValues view – This view has been deprecated because it is a redundant view of SelfService.vwResourceCostCalculatedValue.
InEight Contract and InEight Change UTC field format – Updates have been made to standardize the data types of date fields in Contract and Change views.
Read more
InEight Billings views – The following views have been added for Billings. This is the first release of Billings data in Connected Analytics.
Read more
InEight Contract view – The new SelfService view, SelfService.vwContractBidPackageNote, has been added for Contract.
InEight Control views – The following new Explore and SelfService views have been added for Control.
Read more
InEight Estimate views – The following new Explore views have been added for Estimate.
Read more
SelfService.vwContract – The new fields, PublishRequestStatus and IsPublished have been added to the view.
SelfService.vwContractCostItemPricingDetail – The new field, ContractChangeOrderId, has been added to the view.
SelfService.vwContractPayFormPaymentRequest – Corrected name of the WorkCompletedThroughDate field in the view.
SelfService.vwContractPaymentClaim – The name of the WorkCompletedThroughDate field has been corrected in the view.
SelfService.vwCoreProjectRateCode – The new field, IsAvailable, has been added to the view.
SelfService.vwCoreUnitOfMeasure – The new field, IsAvailable, has been added to the view.
SelfService.vwDesignScopeItemQuantityClaimDetail – The new field, ClaimingSchemeStepId, has been added to the view.
Breaking change in InEight Contract views - In Release 25.3, the field type of the CreatedDate field will change from DateTime to DateTimeOffset in the vw.CCOSummary and vw.PCOSummary views.
Breaking change in InEight Compliance and InEight Completions views - In Release 25.3 to improve performance, the field type of the InspectActivityResponseId field will change from NVARCHAR to BigInt in the SelfService.vwComplianceCurrentEventTaskData and SelfService.vwCompletionsCurrentEventTaskData views.
General release is available starting 09-DEC-2024.
(Release 25.1) InEight Estimate views deprecated fields - Starting in Release 25.1, the following fields in the corresponding Estimate views will no longer provide updated data and will be deprecated.
Read more
(Release 25.1) SelfService.vwEstimateResourceCostsCalculatedValues view – In Release 25.1, the SelfService.vwEstimateResourceCostsCalculatedValues view will be deprecated because it is a redundant view of SelfService.vwResourceCostCalculatedValue.
(Release 25.1) InEight Contract and InEight Change UTC field format – In Release 25.1, updates will be made to standardize the data types of date fields in Contract and Change views, which allows for easier conversion to specific time zones.
InEight Plan Project Structures/Project Values – In this release, the following Plan APIs are currently populated with stale data because of the consumption of Project Structures/Project Values data in Plan.
Read more
InEight Contract views – A new SelfService view, SelfService.vwContractSettingValue, and a new Explore view, Explore.vwContractSettingValue, have been added for Contract.
InEight Design views – New SelfService views, SelfService.vwDesignEngineeringDocumentSummary and SelfService.vwDesignScopeItemClaimingStepDetailChangeIssue, have been added for Design.
InEight Estimate views – New SelfService views have been added for Estimate.
Read more
InEight Plan view – The new SelfService view, SelfService.vwPlanQuantityTrackingITP has been added for Plan.
InEight Report view – The new Explore view, ExploreReport.vwEffectiveProjectPermissions has been added for Report.
InEight Schedule view – The new SelfService view, SelfService.vwScheduleScheduleSnapshot has been added for Schedule.
SelfService.vwContractPaymentRequest – The new field, IsExternalPaymentRequest, has been added in the view.
SelfService.vwContractScheduleOfValue – The new field, IsAvailable, has been added in the view.
SelfService.vwScheduleSchedule – The following new fields have been added in the view.
Read more
SelfService.vwScheduleScheduleActivity – These new fields have been added in the view: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
SelfService.vwScheduleScheduleType – These new fields have been added in the view: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
SelfService.vwScheduleScheduleWorkBreakdownStructure – These new fields have been added in the view: CreatedDate, CreatedById, ModifiedDate, and ModifiedById.
SelfService.vwControlCostItemCharacteristicTypeList – These new fields have been added in the view: CustomLabel and FieldName.
Custom cost category names – The views, Explore.vwControlChangeOrderCost, SelfService.vwControlBilledRevenueDetail, and Selfservice.vwControlChangeOrderCost, have been updated to show custom cost category names.
General release is available starting 07-OCT-2024.
Updated 13-NOV-2024
InEight Plan Project Structures/Project Values - In this release, data in the following views will no longer refresh because of the consumption of Project Structures/Project Values data in Plan. For the new data, reference the SelfService.vwPlanComponentCustomGroupElement view.
Read more
SelfService.vwControlPersonalForecast – Due to performance issues, starting in this release the SelfService.vwControlPersonalForecast view will not report data and has been replaced with the new Explore.vwControlPersonalForecast view. To meet performance expectations, the number of records the view returns has been reduced to include only active records available in the user interface. The SelfService view will be deprecated in a future release.
SelfService.vwControlPayItem view - In this release, for performance reasons multiple fields have been removed from the SelfService.vwControlPayItem view and are instead available in the new SelfService.vwControlPayItemExtended view. The affected fields return null values in the SelfService.vwControlPayItem view and report the actual values in the SelfService.vwControlPayItemExtended view.
Read more
Deprecated fields and breaking changes – Changes to the SelfService.vwPlanComponent view fields in this release include renamed, new, and deprecated fields, as shown in the table. In the Explore.vwPlanComponent view, only TurnoverId and ConstructionCommodityName fields have been updated.
Read more
Logic update for active records – Corrective updates have been made to the logic that determines active records in the database. If you notice abnormalities in data that you are capturing via the ETL process in the views listed, do a full table refresh to truncate and load the data, rather than a delta or incremental update of the impacted records.
Read more
InEight Contract views – New SelfService views and an Explore view have been added for Contract.
Read more
InEight Control views – New SelfService views have been added for Control.
Read more
InEight Design views – New SelfService views and Explore views have been added for Design.
Read more
InEight Plan views – A new SelfService view and Explore views have been added for Plan.
Read more
InEight Platform views – New SelfService views have been added for Platform.
Read more
SelfService.vwChangeWorkflow - New fields have been added for StepNumber, Recipient, and Approvers in the view.
SelfService.vwCoreProject – New fields have been added to the SelfService_Core_Project view.
Read more
SelfService.vwPlanPlanNote – The new field WorkPlanId has been added to the view to enable joining to the WorkPackageConstraintManagement view.
SelfService.vwPlanWorkPackageContraintManagement – The new field WorkPlanConstraintStatus has been added to the view.
General release is available starting 05-AUG-2024.
Updated 19-AUG-2024
API Enhancements – New fields were added to the following APIs.
Read more
API Deprecations/Changes – The following APIs have been deprecated in the 24.7 release as these APIs/fields represent unused table structures because the corresponding functionality is not available in Estimate SaaS.
Read more
InEight Contract APIs – New SelfService APIs and an Explore API have been added for Contract.
Read more
InEight Design APIs – New SelfService APIs have been added for Design.
Read more
InEight Plan API – New SelfService APIs have been added for Plan.
Read more
InEight Estimate APIs – New SelfService APIs have been added for Estimate.
Read more
SelfService_Core_Project – New SelfService Schedule APIs have been added for Core.
Read more
Compliance/Completion Event Task APIs - A data type change has been made to all responses for date characteristic types and are now converted from MM/DD/YYYY to the ISO 8601 format YYYY-MM-DD, which includes button push timestamps. The conversion only occurs in the Response field and the RawResponse fields are not affected.
Read more
SelfService_Core_DocumentApplicationIntegration - A data type change has been made to the IsActive field. The field data type was set to an Integer but has been changed to a Bit.
Release 24.9 Deprecated fields – Starting with Release 24.9, multiple changes that includes deprecating fields will occur in the SelfService.vwPlanComponent view and the Explore.vwPlanComponent view (TurnoverId and ConstructionCommodityName are the only impacted fields in this view).
Read more
SelfService.vwPlanComponentCharacteristic view changes - Due to changes in the source system, data from the ComponentCharacteristicTypeId and ComponentCharacteristicListItemId fields in the view have migrated to the new fields CustomCharacteristicTypeId and CustomCharacteristicTypeElementId, respectively.
API Deprecations/Changes – The following APIs from Estimate SaaS will be deprecated as they are not reporting any data. These changes will be made in the 24.7 release.
Read more
InEight Contract APIs – New SelfService APIs and an Explore API have been added for Contract.
Read more
InEight Control APIs – A new SelfService_Control_ProjectCashFlow API has been added for Control.
InEight Design APIs – A new SelfService_Design_QuantityItemCustomGroupElement and SelfService_Design_LinkedEngineeringProject have been added for Design.
InEight Plan API – New SelfService APIs have been added for Plan.
Read more
SelfService_Core_Project – The new SelfService_Core_CostCategory has been added to this API.
InEight Completions APIs – New SelfService APIs have been added for Completions.
Read more
InEight Control APIs – A new SelfService_Control_SchedulerDetail API has been added for Control.
InEight Estimate APIs – New SelfService APIs have been added for Estimate (cloud).
Read more
InEight Plan API – The SelfService_Plan_TimeCardIntegrationStatus API has been added for Plan.
InEight Platform APIs – New SelfService APIs have been added for Platform.
Read more
SelfService_Contract_Contract – The ContributedAmount field has been added to the SelfService_Contract_Contract API.
SelfService_Contract_IssueSummary – The CreatedBy field has been added to the SelfService_Contract_IssueSummary API.
InEight Estimate Explore APIs – These APIs will only report active records. The data in these APIs will match what can be seen in the Estimate interface and will not report any previous versions of the data. These APIs are intended for business intelligence use cases, such as Power BI reporting.
Read more
InEight Control API – A new Control API has been added in this release for SelfService_Control_CostItemAssignedVendor.
InEight Contract API – Added a new field labeled Notes to the SelfService_Contract_ContractCloseOut API.
InEight Schedule APIs – New SelfService Schedule APIs have been added for Schedule.
Read more
InEight Completions APIs – New Completions APIs have been added in this release for SelfService_Completion_GeneralHeaderData UserID
InEight Compliance APIs – New Compliance APIs have been added in this release for SelfService_Compliance_GeneralHeaderData UserID
InEight Contract API – New SelfService Schedule APIs have been added for Contract.
Read more
InEight Estimate APIs – New SelfService APIs have been added for Estimate.
Read more
SelfService_Core_Project – New SelfService Schedule APIs have been added for Core.
Read more
InEight Schedule APIs – New SelfService Schedule APIs have been added for Schedule.
Read more
InEight Completions APIs – New Completions APIs have been added in this release for SelfService_Completion_ScheduledEventTaskData, Explore_Completion_CurrentEventTaskData, Explore_Completion_FormsandProject, Explore_Completion_ScheduledTaskData.
InEight Compliance APIs – New Compliance APIs have been added in this release for SelfService_Compliance_ScheduledEventTaskData, Explore_Compliance_CurrentEventTaskData, Explore_Compliance_FormsandProject, and Explore_Compliance_ScheduledTaskData.
InEight Contract API – A new Contract API has been added in this release for SelfService_Contract_InvoiceLineItem.
InEight Control APIs – New Control APIs have been added in this release for SelfService_Control_CorporateForecastCostDetail and Explore_Control_CorporateForecastCostDetail.
InEight Platform APIs – New Platform APIs have been added in this release for SelfService_Core_ProjectAssignedContact, SelfService_Core_ProjectCraftRateCode, SelfService_Core_ProjectRateCode, and SelfService_Core_ProjectEquipmentOperationalRateCode.
SelfService_Core_Project – The new field ExternalProjectId has been added to this API.
Updated 07-AUG-2023
SelfService_Control_CurretProjectForecastDetail – The fields Is_Active and Modified_Date have been renamed to IsActive and ModifiedDate to adhere with standard API naming conventions, and the PlugColumnName field has been added to this API.
InEight Schedule APIs – The following set of new Schedule APIs have been added in this release that need to be used in place the existing APIs when your Schedule platform is migrated to the InEight cloud platform. Data that was available from the deprecated APIs will be migrated to the new APIs. These new APIs will refresh once per day.
Read more
Deprecated InEight Schedule APIs – The following APIs will no longer report any data after your Schedule platform has been migrated. These APIs will be available in APIM, but they will not return any data and will be removed from APIM in a future release. All existing data will be migrated to the new APIs.
Read more
InEight Estimate APIs – The following new SelfService APIs have been added for Estimate (cloud).
Read more
SelfSerice_Estimate_Contact API - The contact information will now be sourced from InEight Platform, which can be found in the SelfService_Core_Contact API and will therefore be deprecated in the SelfSerice_Estimate_Contact API in a future release. The following fields will return null values in the SelfService_Estimate_Contact API.
Read more
SelfService_Contract_DetailCostItem – This new API has been added for InEight Contract.
SelfService_Report_DateProject – This new API has been added for InEight Report.
InEight Contract APIs – The following APIs have been modified for Contract.
Read more
SelfService_Control_CostItem – The RowNumber field has been added to this API.
SelfService_Core_ProjectEmployee – The ProjectEmployeeBillingClassId, ProjectRateCodeId, and CustomField1 fields have been added to this API.
SelfService_Estimate_JobReferencedData – The ProjectDisplay and OrganizationDisplay fields have been added to this API. These fields populate with the values from Platform if the Estimate job has been connected to a project.
SelfService_Plan_WorkPackage – The ProjectDisplay field has been added to this API.
SelfService_Core_ProjectEmployeeVersion – With the additions to the SelfService_Core_ProjectEmployee, this API is now redundant as they both report the same data and columns. The fields in the SelfService_Core_ProjectEmployeeVersion API will return null values and the API will be removed in a future release.
Release 23.8 Deprecated APIs – Starting in Release 23.8, the SelfService_Compliance_UserAssignment and SelfService_Completion_UserAssignment APIs will be deprecated and no longer report data.
Updated 15-JUN-2023
API Deprecation – Beginning with Release 23.6, the existing Explore Schedule APIs will be deprecated and a new set of APIs will be released. The deprecated APIs will still be available in APIM, however they will not contain any data.
Read more
InEight Control API – The SelfService_Control_PersonalForecast API was added. This API expose data from the Private forecasts in Control for analysis purposes before pushing changes to the Live forecast.
InEight Contract API – The SelfService_Contract_VendorChangeOrderLineItem API was added. This API includes data from Contracts > Vendor Change Order Log > Line Items.
InEight Estimate APIs – The following SelfService APIs have been added for Estimate (Cloud).
Read more
Updated InEight Control API – The Project Id and Forecast Date fields have been added to the SelfService_Control_CurrentProjectForecastDetail.
Updated InEight Contract API – The DocuSign Status, Sent By, and Company fields from the DocuSign integration have been added to SelfService_Contract_DocumentSignWorkflowHistory.
Updated InEight Completions API – The Is Active field has been added to the SelfService_Completions_UserAssignment API to indicate records that have been soft-deleted.
Updated InEight Compliance API – The Is Active field has been added to the SelfService_Compliance_UserAssignment API to indicate records that have been soft-deleted.
Deprecated APIs – The following Estimate Sync Tool APIs for Estimate (on premise) are not in use and will be deprecated in Release 23.4.
Read more
InEight Estimate APIs – The following new SelfService APIs have been added for Estimate.
Read more
InEight Control APIs – The following new SelfService APIs have been added for Control.
Read more
InEight Completions APIs – APIs have been added for the new Completions product.
Read more
Updated InEight Control API – The Project Id and Forecast Date fields have been added to the SelfService_Control_CorporateForecastDetail API.
Deprecated APIs – The SelfeService Plan_DailyPlanHours and SelfService_Control_CostItmeActual APIs have been deprecated in this release.
Decimal precision – Breaking Change As a result of architectural changes the following APIs/Replicate views and fields have been adjusted to a decimal precision of (28,15). This will not impact Power BI dashboards, but it will impact any ETL operations.
SelfService_Plan_Component: ComponentQuantity, ToDateQuantity, PercentageComplete
SelfService_Plan_QuantityClaim: Claimed_Quantity
oSelfService_Plan_QuantityClaimDetail: ComponentIncrementQuantity, ComponentTotalQuantity, InstallQuantity, ComponentQuantityHistory, StepQuantityHistory, StepQuantity
Explore_Plan_WorkPlanCostItem: Quantity
Data type change in SelfService_Core_UserProject Currently, the Project_ID field in the API reports the Project Display field in the UI. This field in the API has been remapped to the internal project ID and the data type has been updated to a bigint. A new field ProjectDisplay has been added to report the project display ID with a data type of nvarchar (200).
Document reporting APIs – The first set of Document reporting APIs are now available for the Document, Mail, Forms, Packages, and Transmittals modules.
CustomList1Value and CustomList2Value – The SelfService_Contract_IssueDetail, SelfService_Contract_PCODetail, and SelfService_Contract_CCODetail APIs now include text values associated to these IDs for the custom list selections.
SelfService_Contract_PayForm – The Comments field contents from the Contract > Payment Form > Details page are now included in this API.
InEight Plan Timecard Notes APIs – Two new APIs, Explore_Plan_TimeCardNote and SelfService_Plan_TimeCardNote, have been added to expose notes from timecards.
SelfService_Contract_InvoicePayment – These new fields have been added to the SelfService_Contract_InvoicePayment: PostingDate, DocumentYear, ProjectCurrencyAmount, ProjectCurrencyReference, and InvoiceTax Amount.
New API – The Explore_Core_User API reports the same fields as the SelfService_Core_User API but only reports records that are currently active.
SelfService_Plan_Timecard and Explore_Plan_Timecard APIs – The following new fields were added to these APIs:
WorkOrderId
WorkOrderDisplayId
EquipmentRepairedId
EquipmentRepairedDisplay
EquipmentRepairedDescription
LaborCostTypeId
LaborCostTypeName
LaborCostCenterTypeDisplay
EquipmentCostTypeId
EquipmentCostTypeName
EquipmentCostTypeDisplay
OverriddenLaborCostTypeId
OverriddenLaborCostTypeName
OverriddenLaborCostCenterTypeDisplay
OverriddenEquipmentCostTypeId
OverriddenEquipmentCostTypeName
OverriddenEquipmentCostTypeDisplay
Approver1Id
Approver1FullName
ApproverRole1Id
Approver1RoleName
Approver2Id
Approver2FullName
ApproverRole2Id
Approver2RoleName
ExecutorId
Executor1FullName
ExecutorRoleId
Executor1RoleName
ClientApproverName
SentToPayrollById
SentToPayrollByFullName
SentToPayrollDate
ConfirmationRecievedDate
IsAdditionalPayrollInstructionCodeOverriden
EmployeeBillingClassId
EmployeeUDF1
DailyPlanName
TimeCardStatusId
CreatedById
DailyPlanShiftId
TempEmployeeId
TempEquipmentId
SourceSystemId
EmployeeBillingClassName
EmployeeBillingClassDescription
EquipmentBillingClassId
EquipmentBillingClassName
EquipmentBillingClassDescription
SelfService_Plan_QuantityClaim API – The ProjectId field has been added to this API.
Updated 15-NOV-2022
Deprecation of the SelfService_Control_CostItemActual API Due to architectural changes made in the Control application, the SelfService_Control_CostItemActual API will be deprecated this release. The API will still exist in this release, but no data will flow through it. Refer to "Control Actuals Reporting" for detailed information. The following new APIs will be replacing the existing API:
SelfService_Control_ActualQuantity
SelfService_Control_ActualManhours
SelfService_Control_ActualCost
SelfService_Control_ActualsVendorHour
Data type change in Explore_Plan_WorkPackaging API – As a result of changes made in the Work Packaging page with the ability to tag a section as Started, the data type will be an integer that coincides with the status of the section for the following fields:
EnvironmentalComplete
SafetyComplete
QualityComplete
GoalsComplete
LaborComplete
TemporaryStructuresComplete
ToolsComplete
QualityFormComplete
LessonsLearnedComplete
ConstraintsComplete
MaterialsComplete
EquipmentComplete
SchedulesComplete
ComponentsComplete
BudgetsComplete
WorkSequencesComplete
The columns can now be populated with the values 0 (Draft), 1 (Completed), or 2 (Started). In Release 22.10, a new API will be available to populate the text of the status to its integer value.
New APIs – The following SelfService APIs have been added:
SelfService_Contract_CostItemPricingCategory – This API shows the cost categories as they are shown in the Cost Item Pricing feature.
SelfService_Contract_CostItemPricingResourceCategoryCost - This API shows the cost at the resource level from the Cost Item Pricing feature.
SelfService_Contract_CostItemPricingResource – This API shows the Resources assigned in the Cost Item Pricing feature.
SelfService_Control_ActualVendorHours - This API shows Actual Vendor hours from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualQuantity – This API shows Actual Quantities from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualManhours – This API shows Actual Manhours from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Control_ActualCost – This API shows Actual Cost from Control, it can be used by joining to the SelfService_Control_CostItem API.
SelfService_Core_Market This API shows the data as entered in the Market section of the project Details page.
SelfService_Core_ProjectMarket – This API shows markets and the project associated with them.
SelfService_Core_Union – This API shows the data from Master data libraries > Unions.
SelfService_Core_RevenueCategory – This API shows the data from Master data libraries > Revenue Categories.
SelfService_Core_Qualification – This API shows data from Master data libraries > Qualification.
SelfService_Core_PaymentTerms – This API shows data from Master data libraries > Payment terms.
SelfService_Core_Material – This API shows data from Master data libraries > Operational resources > Material.
SelfService_Core_MeasurementType – This API shows the data from Master data libraries > Units of measure > Measurement types.
SelfService_Core_Incoterms – This API shows data from Master data libraries > Incoterms.
SelfService_Core_GeneralLedgerAccount – This API shows data from Master data libraries > General ledger accounts.
SelfService_Core_Discipline – This API shows data from Master data libraries > Disciplines and commodities > Disciplines.
SelfService_Core_ContactType – This API shows data from Master data libraries > Cost centers> Contact types.
SelfService_Core_Contact – This API shows data from Master data libraries > Contacts > Contacts.
SelfService_Core_Commodity – This API shows data from Master data libraries > Disciplines and commodities > Commodities.
Updated API – The Notes field on the project Details page has been added to the SelfService_Core_Project API.
Updated 07-OCT-2022
Deprecation of the SelfService_Control_CostItemActual API in Release 22.8 – Due to architectural changes made in the Control application, the SelfService_Control_CostItemActual API will be deprecated. The API will still exist, but no data will flow through it. The following new APIs will be replacing the existing API, and additional information will be provided in the 22.8 release notes.
SelfService_Control_ActualQuantity
SelfService_Control_ActualManhours
SelfService_Control_ActualCost
New APIs – The following SelfService APIs have been added:
SelfService_Core_EmployeeCertification – This API exposes the data from Operational Resources > Edit Employee > Certifications.
SelfService_Core_Vendor – This API exposes the data from Master data libraries > Vendors > Vendors.
SelfService_Core_AccountCodeCharacteristicTypeList – This API exposes the values assigned to account code tags and can be used with the SelfService_Control_AccountCodeCharacteristic API.
SelfService_Contract_VendorAssociatedChangeItem – This API exposes the data from Contract > Contracts > Details > Associated change items.
SelfService_Control_ForecastNote – This API exposes the notes associated to a forecast, as well as information about the forecast such as the forecast type, snapshot ID, and cost item ID.
Explore_Plan_Timecard – This API exposes the timecard data and contains the same fields as the SelfService_Plan_Timecard API, with the exception that this API only reports active records and refreshes every 20 minutes.
Updated APIs – The following SelfService APIs have been updated:
SelfService_Plan_Timecard – The refresh rate for this API has been changed to once per day due to performance degradation. If you need to receive the 20-minute refresh interval, you must use the new Explore_Plan_Timecard API.
SelfService_Contract_LineItem – When there are multiple WBS phase codes associated to a line item, the WBSPhaseCode field must be separated by pipes (||) instead of a comma.
Explore_Contract_AccrualDetail – Three new fields have been added to the API, ContractDetailId, LineItemCode, and CostItemId. When there are multiple cost items per accrual detail record, the CostItemId field must be separated by pipes (||).
SelfService_Contract_IssueSummary – The CostItemId field has been added to the API. When there are multiple cost items per accrual detail record, the CostItemId field must be separated by pipes (||).
SelfService_Contract_VCOLineItemDetail – Two new fields, CostItemID and LineItemDescription, have been added to the API.
APIs – The following new SelfService APIs have been added:
SelfService_Plan_DailyPlanResourceDetailBillingClass – This API exposes the billing classes as assigned to resources on a daily plan.
SelfService_Core_VendorType – This API contains the data for vendor types that is in Master data libraries > Vendors > Vendor types.
SelfService_Core_AccountCodeImportLog – This API reports the data from the Account Code Import Log that is in Master data libraries > Account codes > Import log.
SelfService_Core_AccountCodeCharacteristicTypeList – This API exposes the Account Code tags as defined at the organization level.
Additional Information