Disciplines

Summary

You can define disciplines for the Engineering module to associate with resource types and claiming schemes. Examples of disciplines might be architectural, civil, or drainage. The list of available disciplines are configured at the organization level in Settings > Design > Engineering > Disciplines. Disciplines configured at the organization level are available to all projects.

To add a new discipline, enter an ID and a description, and then click the Add discipline icon.

To edit disciplines, click in the fields, and then enter text. To remove a discipline, click the Remove discipline icon to the right. To adjust the position of a discipline in the list, select the discipline, and then click the up or down arrows to the right of the table.

Considerations

  • You must have the permission Edit engineering settings.

  • You cannot remove a discipline when it is assigned to a resource type or assigned to a claiming scheme.

Related links

After disciplines are set up, you can configure claiming schemes. For more information, see Configure claiming schemes.