Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
With InEight Model, project teams can easily leverage accurate model data from a single source of truth to perform critical project controls functions. Estimators and work planners need components and quantities that come from the model. Designers and engineers need models to perform design reviews and clash detection prior to construction. QA/QC and commissioning managers need to ensure that all project’s components and systems have been properly inspected and signed off. InEight Model not only supports these workflows, but it also makes it easy to use the model for visual reporting, such as color-coding the model by completion status.
And when the project is complete, InEight BIM/Digital Twin enables a living digital twin that brings together as-designed and as-built information, and connects it with project documentation such as specs, warranty documents, quality inspection forms, jobsite photos and more. The digital twin becomes an immensely valuable asset to the owner/operator, replacing a mountain of paperwork and disconnected electronic files with a structured, searchable digital record that can be accessed simply by interacting with the model.
BUILD
Aggregate, clean up and tag design data across multiple disciplines within a common BIM environment.
CONNECT
Improve collaboration across the entire project team by connecting model data to workflows such as estimating, design review, work planning, quality, and commissioning.
INNOVATE
Create digital twins to support ongoing asset maintenance by connecting as-built models with project documentation, photos, and inspection forms.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information