General release is available starting 23-JUN-2025.
Updated 29-JUL-2025
New Pricing page – The Cost item pricing page is now called the Pricing page and shows as a tab at the issue level. You no longer have to go to the Pricing summary to get to cost item pricing information. The new Pricing page combines features of both cost item pricing and the pricing summary to enhance your ability to add cost item pricing.
Read more
Change template cost item pricing grouping – When you upload a Microsoft Word or Microsoft Excel template that has a cost item pricing collection table, a new section on the Template details page lets you specify grouping. The groups give you flexibility with how table data is presented. For example, if you select the Cost item tag field, the generated document groups the collection table by cost item. You can also specify columns to show with subtotals.
Read more
Markups collection table and tags – A new collection table and tags for Markups are available in the Change document templates at both the organization and project levels. The collection table tags gather the information from the Pricing and Pricing summary tabs and writes it in a collection table. For information, see Collection tables.
Cost categories tab retains column selection – The cost item pricing Cost category tab now retains views after you leave a page. You can select the columns you want to show in the cost category tab one time and those selections are maintained.
Markup value field now functions as a value field – On the Pricing page, the Add manual markup value field was functioning as a percentage field. You can now add a manual markup value correctly, including adding negative markup values where necessary.
The Post back dialog box now opens when you click Add from InEight Document – Previously, when adding a document from Document’s Documents module to Change, the Post back dialog box did not open. Now, the Post back dialog box now opens correctly.
Edit Change permission for manual markups – The permission needed to add a manual mark up has been changed to Edit Change. Previously, the Edit Change Settings permission was required in error.
Pricing grid right-click functionality – A right-click menu has been added to lines in the Pricing grid to give you options to add a new or existing cost item or to edit, copy or delete a cost item. These options can save time and eliminate the need to highlight the cost item and then scroll to the tool bar to click the applicable icon.