Access Attachments

View an Attachment in a Desktop Application

When an Image file is attached, viewing functionality is limited to:

  1. Save and Print
  2. Rotate clockwise and counter-clockwise
  3. Zoom In and Zoom Out

When attaching a PDF document, all functionalities exist, including:

  Description
1 Save and Print
2 Facing 2-up and 4-up
3 Single page, Single Continuous and Pan
4 First / Last Page and Previous / Next Page
5 Select
6 Fit Page and Fit Width
7 Rotate Clockwise and Counter-Clockwise
8 Zoom In and Zoom Out

When opening a Word or Excel document, a pop-up asks if you would like to launch the file in its default application. Click Yes to proceed.

We do not recommend uploading external applications such as Word or Excel, due to conversion issues when printing.

Link Attachments

Linking an attachment is useful when a desired attachment exists in one area, and also when tying it to another aspect of the project.

Click on an Attachments button, from Inspection History in our example.

With no current attachments tied to this inspection, click on File From Archive Library.

The File From Archive Library button directs you to the Archive Library where all project documentation is stored.

 

Store Document in the Archive Library

The Archive Library is used to store and distribute versioned project documents.

InEight Completions also automatically stores files and photos making them accessible within all Completions applications.

The following actions in the Archive Library can be accessed:

 

Description

1 Search
2 Download All & Remove Local Activity
3 Stop Download
4 New Folder
5 Import Files
6 More Info
7 Label Filter

The following Step-By-Step outlines how to view attachments within a selected archive folder.

Step by Step — View Attachment List Within an Archive Folder

1. Click on the Archive Library button.

2. Open any folder by clicking on the folder tile or the Carrot to the left of the file folder.

3. Click on the desired folder, being aware additional sub-folders may exist.

  • If the file has not yet been downloaded, the phrase Not Downloaded will appear in yellow, and the Download button is available
  • If the file has already been downloaded, the term Downloaded will appear in Green, and the View button is available

4. Click on the respective Download or View button.