Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
General release is available starting 02-MAR-2026.
SQC Project Structure filtering and performance – You now see a new Project Structure icon in your To-do list and on the checkout screen in the SQC mobile app. Tap it to quickly filter your events and tasks by project areas like the web. This helps you focus on the exact work you need, without scrolling through long lists. Your filters on the To-do list remain between sessions, keeping your focus on the forms you need to complete.
Read more
General release is available starting 29-DEC-2025.
*Updated 29-JAN-2026
Automapping enhancement – You now get a smoother, more consistent automapping experience across InEight Platform, InEight Plan, and Completions . You can manage your mapped project structure and component values directly from the source using a new multi-select validated list, perform bulk updates through export and import, and keep everything aligned since Completions and Compliance now pull the mapped values from Platform and Plan setups.
Read more
*DisplayID Format Update (Automapping Scalability Enhancement) – To support higher-volume automapping, the DisplayID format for events and tasks has been updated. The previous format (e.g., 2025012700014) supported up to 99,999 IDs per organization per day. To eliminate this cap without increasing ID length, the year portion has been shortened from four to two digits.
Old format: 2025012700014
New format: 2501270000014
This change increases capacity to 9,999,999 IDs per day. It applies only to newly created events and tasks; existing records remain unchanged. No action is required unless your team uses string-based parsing of DisplayIDs, in which case the new year format should be noted.
General release is available starting 27-OCT-2025.
Custom ID hyperlink and reference widget – Values in the Custom ID column now have hyperlinks enabled to open associated activities.
Read more
SQC file attachment error – You now get an error message when an attachment is more than 50MB. Previously, when the file size was greater than 50MB, you were not notified that the attachment was not uploaded.
Read more
*Updated 11-AUG-2025
General release is available starting 25-AUG-2025.
Check-in and Check-out – A new feature lets events and tasks be checked out to specific users. Check out is applicable to any event or task from any reporter, regardless of status, including those with active form flows. The events and tasks can now sync with the SQC mobile app once assigned and completed in the field.
Read more
Large event/task print support – When printing events or tasks with attachments that exceed 25MB, the process now runs in the background. When completed, an email is sent with a link to the PDF document. Previously, events or tasks with many photo attachments resulted in a time allotment error. For more information, see Event and Task Management.
Event and Task grid improvements – Improvements have been made to queries that support the event and task grid. As part of enhancing load reliability for the event/task grid, updates have been made to how column filters show content.
Read more
*User Assignment limit increase – There is now a limit of 50,000 user assignments that can be assigned at one time, an increase from the previous limit of 5,000 users. If you try to assign more than 50,000 users, a warning message shows stating that the user assignments exceed the maximum limit. For more information, see User Assignments.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance.
Reporting refresh – To show faster response times, enhancements were made to show updates and changes in near real time . Previously, there was a 15-minute delay. For more information, see In-app reporting.
SQC Integrated list– Integrated lists for the current supported items, equipment, and vendors are now available offline in the SQC mobile app.
Read more
To-Do List sorting on SQC Mobile – A sorting option was added to the To-Do List to enhance productivity and make managing your events and tasks more efficient.
Read more
Improved messaging in Submission History page – Enhancements were made to the Submission History page to clearly differentiate between the sync and event dates and times, along with showing the event task ID. This update helps prevent confusion, ensuring users no longer mistake the submission date for the event date on the web.
Read more
If you set this feature to Off, you have to manually sync regularly to ensure any updates are captured to permissions, projects, and templates. The Auto Sync feature is in Settings > Sync Profile.
User Assignment limit – There is now a limit of 5000 user assignments that can be assigned at a time. Upon completion of selecting category or roles, you no longer need to wait while the changes take place as they will be handled in the background on the server. When adding more than 5000, you will get a warning.
Read more
Submission history details on SQC Mobile – This improves our ability to understand issues that may arise on mobile devices and why events or tasks may not sync from the device back to the web.
Cache clear on SQC Mobile – The cache clear option lets users clear out their current projects database and results in a clear update. Occasionally, users report issues that we are not able to recreate, and previously we’d ask the user to either delete and reinstall the application or delete the project and reinstall. The cache clear option eliminates the need to reinstall the app.
Read more
Searchable Component and Project Structure values – SQC search now searches project structure and component fields for events/tasks that reside locally on the device.
Additional attachment types – SQC now accepts Word, Excel, and PDF attachment types. Previously, only photos could be attached. For more information, see
Integrated questions – When connected to the internet on the SQC app, you can now interact with integrated lists and reference questions. Previously, integrated question types were only available in the Web application. For more information, see Filling out an Event or Task.
General release is available starting 09-DEC-2024.
Mandatory button fields – Button question types marked as mandatory are now included and enforced when completing or advancing form validations.
New Auto Sync feature – This new feature performs a daily delta sync for the active, downloaded project. The delta sync updates any changes to permissions, projects, and templates in the SQC mobile application. This feature is set to On by default for all users starting this release of the SQC mobile application. If you set this feature to Off, you have to manually sync regularly to ensure any updates are captured to permissions, projects, and templates. The Auto Sync feature is in Settings > Sync Profile.
Item Locked message in forms and tasks – The Item Locked message has been updated and a new Unlock and Edit option has been added to the options in the message.
Read more
To-do List Action Required message – When you open a new project and have pending saved forms or tasks, the updated alert message prompts you to go to your To-Do List Saved tab to sync, submit, or delete the items in the list prior to downloading a new project.
Read more
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance mobile.
Project structure and ITP template headers for tasks – The option to create dynamic template headers for events is now available for tasks. For more information about headers, see Headers Overview.
Project structure and ITP template headers for tasks – In the SQC mobile app, you can now view, update, and sync dynamic template header question values for tasks. For more information about headers, see Headers Overview.
UI and sync improvements - The primary project, which is the last project downloaded, now shows as Active on the Projects > Recent tab. The previously downloaded project remains on the device with partial data to improve sync performance when the user switches projects.
Read more
Automapping feature – You can now setup automapping to map templates to project values in the project structure or components and create a series of checklists for project structure levels (nodes) or inspection and test plans. Automapping setup lets you configure a series of map values that will be used as tags you can map to nodes in project structure, which can then be mapped to templates. This eliminates having to manually perform this process.
Read more
Updated 16-FEB-2024
Sync improvement- The auto-sync feature has been disabled, and the application no longer syncs automatically when launched. Now, a banner at the top of the application informs you when the last project sync took place. You must sync the application to get the most recent updates, such as the latest template revisions, permissions, or access to newly assigned projects.
Notice that when you sync your project now, the application only syncs the current (most recently downloaded) active project. The application no longer syncs multiple projects, which minimizes the time needed to sync the project. The previously active project still shows in recent projects but will not sync. For more information about syncing, see Sync.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance mobile.
Updated 05-OCT-2023
Predefined email template reminders – Two new email templates have been added in Module settings > Email templates, Reminder of upcoming event and Reminder of upcoming task. When enabled, they will remind users of upcoming events or tasks prior to their due date.
Read more
IWP widget feature – A new installation work package widget panel that integrates with InEight Plan components can now be enabled to show in the module landing page.
Read more
Project structure tree – You can now use the project structure hierarchy and component values to filter related events on the event grid.
Read more
Updated 05-OCT-2023
Project structure and Inspection and Test Plan (ITP) template headers - You can now view, update, and sync dynamic header form question values on your SQC mobile application. When selecting a template header drop-down field, the options will show at the bottom of the screen. You can scroll through the options and tap on your selection.
Read more
Inspection and Test Plans – You can now create inspection and test plans and integrate with InEight Plan components.
Read more
A new Project settings tab has been added to role configuration – The Project Settings tab lets you enable features in a project.
Read more
Project settings enhancements – Project settings has been updated and is now a new tab in module settings.
Read more
Project structure and ITP tab and template headers – You can now create new template headers for your forms in the headers tab.
Read more
Project structure and Inspection and Test Plan (ITP) template headers – You can now view template headers when performing forms in your mobile device.
Read more
Type field available to use in template forms – You can create and manage type values and use them in template forms.
Read more
Integrated list question type (Web only) – An integrated list form question type has been added that integrates with InEight Platform resources.
Read more
API generator - Users with applicable permissions to the API generator and Completions module can create a custom reportable API for a specific form. For more information about the API generator, refer to InEight Explore release notes.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance mobile.
The Quality module is now called InEight Completions – The Quality module has migrated from Compliance and is now called InEight Completions. It is no longer part of Compliance. You can access all your Quality module data in Completions. In the InEight cloud platform, you can access Completions from the main menu.
Query builder – Query builder that can be used on event, task, and component list pages and future functionality with the project structure.
Read more
Update 07-Mar-2023
Inspection and test plans – This feature initially scheduled and previously documented for Release 22.12 has been postponed. To provide a better user experience, the ITP and Project Structures features are both scheduled to be available in Release 23.6.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance Mobile
Supported currencies (web and mobile - compatible with web version 22.10) - New and existing currencies are now updated from the master data library in InEight Platform. This change lets you view all currencies supported throughout the InEight cloud platform.
Reference questions enhancements (web only) You can add new reference types to the reference question on a template.
Read more
Push notification enhancements (mobile – compatible with web version 22.10) – You can now set up push notifications on your iOS mobile device.
Read more
View active form flow (web only) – You can now view the status of an active form flow inside an event, so that you do not have to go back to the Events page.
Read more
Quick start forms and tasks enhancements (web and mobile – compatible with web version 22.8) – The quick start options for forms and tasks on the module landing page have been enhanced for an improved user experience.
Read more
Quick start forms and tasks enhancements (mobile and web – compatible with web version 22.8) – The quick start options for forms and tasks on the module landing page have been enhanced for an improved user experience.
Read more
Exceptions (web and mobile – compatible with web version 22.4) – Responses to list and choice questions can now be marked as exceptions. This feature is useful to indicate responses that are undesired or outside of normal business processes in some way and have those exceptions show in reporting.
Read more
Edit event/task permissions (web only) – The Edit event/task properties role permission has been broken out into more detailed permissions.
Read more
Role permissions redesign (web only) – The Add and Edit role dialog boxes have been redesigned so that roles are grouped into tabs.
Exceptions (mobile and web – compatible with web version 22.6) – Responses to list and choice questions can now be marked as exceptions. This feature is useful to indicate responses that are undesired or outside of normal business processes in some way and have those exceptions show in reporting.
Read more
Form and task header (mobile only) – The header of mobile forms and tasks now shows additional information.
Read more
InEight Document attachments (web and mobile – compatible with web version 22.4) – Integration with Document lets you attach supporting documents from the Document application when performing a form or task.
Read more
InEight Document attachments (mobile and web – compatible with web version 22.4) – Integration with Document lets you see if supporting documents from the Document application are attached when performing a form or task.
Read more
Sync improvement – Syncing performance has been improved. The amount of time it takes for the initial sync to finish has been moderately improved and all syncs after the initial one now only find new and updated data, which has significantly reduced sync times.
Updated 15-MAR-2022
Save and send views (web only) – You can create views and send them to users and roles.
Read more
Change status with form and task buttons (web only) – You can change an event or task’s status when you click a form or task button.
Read more
Save and start a new task (web only) – You can now save the current task and immediately create a new task with one button.
Read more
Assign and start a new task (web and mobile – compatible with web version 22.2) – You can now assign the current task and immediately create a new task with one button.
Read more
Reference type (web only) – The References dialog box shows the type for each reference.
Read more
Custom ID increments per project (web only) – When you create a custom ID you can now apply it to all projects so that the number increases separately for each project.
Read more
Assign and start a new task (mobile and web – compatible with web version 22.2) – You can now assign the current task and immediately create a new task with one button.
Read more
Updated 10-FEB-2022
Template integration – You can make templates available for integration with other InEight applications.
Read moreWatch video
Change module – A new standard module stores tasks for integration with InEight Change.
Category selection for permissions – When selecting categories to apply for event and task permissions, the drop-down list stays open.
Read more
Events and Tasks page date range – When you first open the Events or Tasks page, the default filtered date range is from 30 days before today to 30 days after today.
Read more
Terms and conditions (mobile only) – Terms and conditions are now shown after signing in for all locations. You might have to acknowledge multiple terms and conditions.
Print from Events and Tasks lists (web only) – A new icon on the Events and Tasks lists lets you run the Compliance General forms report on a single event or task.
Read moreWatch video
Some Compliance mobile 21.10 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Sync profiles (mobile only – compatible with all web versions) – You can choose whether to automatically download events and tasks.
Read more
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance.
In this release, no features were added but technical improvements were made in the background to enhance your experience in Compliance.
People picker enhancement (web and mobile – compatible with web version 21.5 ) – You can select multiple users or none in the people picker question type.
Read more
Save and close (web only) – When you fill out a form or task, you can save and close or just save without closing.
Read more
Reverse form flow cc (web only) – When you reverse a form flow, you can cc users associated with steps other than the step being reversed to. This feature ensures that users are aware that a flow has been reversed to a step before theirs.
GPS edit lock (web and mobile – compatible with all web versions ) – When a GPS location is automatically entered, you cannot manually edit the coordinates when filling out a form or task.
Assign user groups to form flows (web only) – User groups can now be responsible for form flow steps.
Norwegian (web and mobile – compatible with web version 21.5 ) – Compliance is available in the Norwegian (Bokmål) language.
Common navigation (web only) – The common navigation used across all InEight cloud platform applications has been enhanced for ease of use. For more details, refer to InEight Platform release notes.
Some Compliance mobile 21.5 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Search on multi-level list (mobile only) – This feature lets you search every level in a multi-level question in an event or task.
Read more
People picker enhancement (mobile and web – compatible with web version 21.5 ) – You can select multiple users or none in the people picker question type.
Read more
GPS edit lock (mobile and web – compatible with all web versions ) – When a GPS location is automatically entered, you cannot manually edit the coordinates when filling out a form or task.
Open from InEight Progress mobile (mobile only) – You can open the Compliance app using a link in the Progress app.
Norwegian (mobile and web – compatible with web version 21.5 ) – Compliance is available in the Norwegian (Bokmål) language.
Search on multi-level list (web only) – This feature lets you search every level in a multi-level question in an event or task.
Read more
Transfer assignments between users (web only) – You can reassign forms, tasks, and workflow between users by transferring user assignments. This change makes it easier to reassign an employee’s responsibilities if they change roles or leave the company.
Read more
Default list values (web and mobile – compatible with web version 21.3) – You can set default values for radio button, check box, and drop-down list questions.
Read more
People picker enhancement (web and mobile – compatible with web version 21.3) – For the people picker question type, you can decide whether to pull users from only those assigned or from all resources in InEight Platform. An option to email the selected user has also been added.
Read more
Default list values (mobile and web – compatible with web version 21.3) – You can set default values for radio button, check box, and drop-down list questions.
Read more
People picker enhancement (mobile and web – compatible with web version 21.3) – Depending on how a people picker question has been set up, an email can now be sent to the user you select.
Mobile keyboard enhancements (mobile only) – The mobile keyboard checks spelling, suggests text, and automatically inserts a period when you tap the space bar twice.
Copy sections (web and mobile – compatible with web version 21.1) – You can copy sections when filling out a form or task. This change gives you the flexibility to determine if duplicate sections are needed, instead of creating templates with duplicate sections in advance.
Read more.
Link event or task after creation (web only) – You can link events or tasks to each other that were not started from another event or task. This change lets you add a reference to items together that were not created together.
Read more.
Copy multiple tasks (web only) – You can copy multiple tasks at once from the Tasks page.
Read more.
GPS in forms and tasks (web and mobile – compatible with web version 21.1) – Forms and tasks can collect GPS coordinates.
Read more.
Settings reorganization (web only) – Settings have been reorganized to include project-level settings.
Read more.
User groups (web only) – User groups are used to give access to events and tasks that might be beyond users’ usual permissions.
Read more.
Leading logic enhancements (web only) – You can now choose All or Any to apply rules to a logic set. You can also apply the operators Is or Is Not to a particular rule.
Read more.
Copy sections (mobile and web – compatible with web version 21.1) – You can copy sections when filling out a form or task. This change gives you the flexibility to determine if duplicate sections are needed, instead of creating templates with duplicate sections in advance.
Read more.
GPS in forms and tasks (mobile and web – compatible with web version 21.1) – Forms and tasks can collect GPS coordinates.
Read more.
Custom template IDs (web only) – You can assign custom IDs to form and task templates, allowing you to sort and filter by custom ID for better management of your events and tasks.
Read more.
Global view (web only) – You can view the Events and Tasks pages by filtering outside of the current navigation.
Read more.
Events and tasks bulk edit (web only) – The Events and Tasks pages now let you edit properties in bulk after selecting a single template, saving you time from editing individual events and tasks.
Read more.
Mandatory multi-level selection (web and mobile - compatible with web version 20.11) – You can set a level of a multi-level list as mandatory. This mandatory level determines how many levels down users must expand the list to make a selection, instead of just clicking through without expanding the list beyond the first level.
Read more.
Event and task references (web only) – Existing events and tasks are available to select as references in other events or tasks.
Read more.
Role access enhancement (web only) – You have more options to manage access to whole template sections instead of just individual questions.
Read more.
Re-enable form flow (web only) – You can re-enable a form flow after a form is completed to give you the option to restart a form flow while maintaining existing data.
Read more.
Number question type enhancement (web and mobile - compatible with web version 20.11) – A phone number option has been added to the Number question type.
Mandatory multi-level selection (mobile and web - compatible with web version 20.11) – A level of a multi-level list can now be set as mandatory. This mandatory level determines how many levels down you must expand the list to make a selection, instead of just clicking through without expanding the list beyond the first level.
Read more.
Number question type enhancement (web and mobile - compatible with web version 20.11) – A phone number option has been added to the Number question type.
Auto assign per project attributes (web only) – You can define attributes per project to assign user assignments and template associations automatically to an alternate hierarchy.
Read more.
Template translation (web only) – Export and import functions have been added to allow translations in the available languages to be applied to a template, giving you a quick and easy way to enter translations.
Read more.
Reporting tags (web only) – Reporting tags are defined per module to be assigned to questions in a template. These tags drive permissions when running reports.
Read more.
Hide templates (web only) – You can hide templates from being started as stand-alone forms or tasks. When hidden, these templates can be used only through association with the Form Button.
Read more.
Some Compliance mobile 20.9 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Kiosk mode (mobile only - compatible with all web versions) – This new mode for offline use with the mobile application lets anyone perform tasks or events, even if they are not users in the system.
Read more.
To do list (web only - previously only available on mobile) – The module landing web page now shows a week’s view of your current assigned and pending tasks and scheduled or pending events, giving you a single place to see what is assigned to you. This feature was previously only available on mobile.
Read more.
Automatic user assignment (web only) – There is a new setting for each module that uses InEight Platform user settings to apply Compliance assignments, saving you administrative setup time for each user.
Read more.
Event and task history (web only) – You can now see the history of all changes made to an event or task that is being performed. Your user security settings determine the changes that are shown.
Read more.
Schedule events and dates (web only) – You can now schedule an event for the future, assign a user, and set an event date. If the event date is passed, the event state is changed to overdue.
Read more.
Exclude weekends (web and mobile) – When you schedule an event or task, you can now exclude weekends, which might better align with your business processes.
Read more.
Not Applicable icon (web only) – The Choice question type has a Not Applicable icon options, so you can easily add an N/A option without typing it separately. The N/A option was previously only available for text choices.
Read more.
Attachment column (web only) – A new column has been added to the Events and Tasks pages that shows whether there are any attachments. When you click the attachment icon, a dialog box shows thumbnails of the attachments for quick viewing.
Read more.
Some Compliance mobile 20.7 features are backward-compatible with previous web versions. Backward-compatibility differs by feature and is detailed below.
Exclude weekends (mobile and web - compatible with all web versions) – When you schedule an event or task, you can now exclude weekends, which might better align with your business processes.
Read more.
Mobile attachment name (mobile only - compatible with all web versions) – You can now add a photo from your mobile device and define a name for that photo to show in the event or task, so each attachment can be identified.
Read more.
Form flow – Now you can add workflow functionality to any form template, which lets responsible parties be actively engaged in an event’s process life cycle. Multiple form flows can be added to a form template to suit your business processes.
Read more.
Builder– The form flow builder lets you add steps, assign responsibilities to roles or users, specify the actions that will change form statuses, and set edit and view access for each step.
Read more.
New button type – The template builder’s new Form Flow button kicks off flows and completes flow steps.
Read more.
Current status view – You can view a snapshot of an event’s current form flow status, such as which step it is on, who needs to perform actions, and the number of days until the event is overdue.
Read more.
Start on mobile – When completing an event on a mobile device, you can start a form flow’s first step and then complete remaining steps on the web.
Read more.
Form integration tag – You can now add an integration tag to a form template which flags that form to be included in reporting. Specific questions in that form with the same integration tag are then reported on.
Read more.
Compliance mobile version 20.2 is backwards-compatible with web versions 19.11 and 19.9.
Persistent association to parent organizations and future children – This feature lets you associate templates, modules, and users to a parent organization and all its children with one click. The association can also persist through to any new children (suborganizations and projects) that get associated after the original selection, so you don’t have to manually add each new project.
Read more.
Multi-level drop-down question type – A multi-level drop-down option has been added to the list question type. The updated user interface also allows better management of list items for greater control of data in the database.
Read more.
Classifications – Classifications let you apply logic to sections in a template to better facilitate a form process for the end user while filling out an event. This feature hides or shows sections and their questions based on the logic applied for a classification association.
Read more.
Section navigator in builder – You can now easily navigate through the template builder with a section navigator, instead of having to scroll to find sections.
Read more.
Builder – The new builder allows you to create task templates. Starting with predefined mandatory fields will make template creation easier than before.
Read more.
Lists– You can see all tasks in one list that shows the responsible party, due dates, statuses and more. You are also able to start stand-alone tasks directly from the module landing page, saving time in task creation.
Read more.
Web and mobile functionality– You have multiple ways to perform tasks on the web, including as stand-alone items or from within forms using the quick start tasks list or from an event or task itself. Mobile tasks have all the same abilities as performing tasks on the web with the added ease and efficiency of offline use.
Read more.
Sync in advance on mobile – In Settings, you now see a sync settings area that allow you to sync items from the web to your mobile device one, two or three weeks in the future to complete them offline. This feature allows tasks to be available on mobile when they are assigned and ahead of time, so they can be completed offline.
Read more.
Referenced forms and tasks – When you create a task from another task or event, you now see the referenced item in both associated tasks or events, letting you see which events and tasks are associated. You are also able to start a task from the section area of an event, not just a question, which is useful for reporting purposes.
Read more.
Attachments association – You can now see all attachments associated with an event or task by using the attachments link in the details panel from the events and tasks lists or from the event or task itself. Previously, you had to open each question to see an attachment.
Read more.
Email templates library – The email templates library allows you to customize the standard product email notifications that are sent following specific actions such as task assignment or overdue items. Previously, you were given a set of standard email templates that might not have covered every scenario suited to your organization.
Read more.
History logs – History is kept on any changes made to users, roles and templates. Presenting history in a grid will allow you to easily sort and filter data for auditing.
Read more.
Copy events – The ability to copy an event and all associated tasks and attachments is useful when you have many tasks and attachments that mimic the last event, such as an environmental permit event.
Read more.
Mobile To-Do list – The To-Do list on mobile shows assigned tasks as well as saved events and tasks. By using the advanced sync option, you can pull your scheduled forms and assigned tasks from the web to your mobile device.
Read more.
Template section navigator – A new icon has been added to form and task templates that lets you navigate to specific sections quickly, which saves time scrolling.
Read more.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2026 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information