Design 24.5 Release Notes

Updated 03-JUN-2024

  • Archive flag feature for quantity items – In the project’s Quantity Forecasting module, you can now set quantity items as archived to improve the project load performance of large projects by not loading archived items. ClosedRead more

    Throughout the design phase, quantity items set to Archived do not load nor show in the grid when the Archived toggle is set to On. The toggle is set to On by default.

    You can make the archived items show by setting the Hide Archived toggle to Off. When setting the toggle to Off, the items marked as archived will load and show in the grid.

    For more information, see Quantity items.

  • Account code set UoM validation toggle added to project settings in engineering – In the projects Engineering settings, a Validate UoM for claiming toggle has been added to the Account code set tab to provide administrators an option to choose to validate the account code primary UOM from the master library. Contact your InEight representative for information about enabling this feature. ClosedRead more

    When the Validate UoM for claiming toggle is set to On, the UoM in account code, scope item, and WBS must match. By setting the Validate UoM for claiming toggle to Off, only the UoM for the scope item and WBS must match.

    For more information, see Account code set in project settings for Engineering.