Cause codes (Engineering)

In the Engineering module, cause codes are required when a quantity change occurs. For more information, see Update scope item quantities.

You can manage cause codes for your organization in Settings > Design > Engineering > Cause codes.

Steps

You can do the following actions:

  • Add - Enter and ID description, and then click the Add cause code icon.

  • Remove - Click the Remove cause code icon to the right. You cannot remove a cause code assigned to a scope item on a project.

  • Edit - Click in the fields, and then enter text or select an option.

  • Sort - Select a cause code, and then click the up and down arrows to the right of the table to adjust the position of the cause code.

Cause codes configured at the organization level are available to all projects.

Considerations

You must have Level 3 – Account Admin permissions in InEight Platform or a role with the applicable permissions in Engineering.