Milestones are attributes for claiming schemes. In projects, you can define completion milestones to be assigned to claiming scheme steps. Examples of completion milestones are Issue for Review or Issue for Construction. At the project level, all milestones from the parent organization are automatically inherited and you can assign or remove milestones as needed.
A system-generated milestone named Scope Complete is automatically assigned to every project to ensure that all scope item’s scope can be planned with dates.
You can manage Milestones for your organization in Settings > Design > Engineering > Milestones.
You can do any of the following actions:
Add - Enter an ID and Description, and then click the Add milestone icon.
Remove - Click the Remove milestone icon to the right. You cannot remove a milestone that has been assigned to a project.
Edit - Click in the fields, and then enter text.
Sort - Select a milestone, and then click the up and down arrows to the right of the table to adjust the position of the milestone.
You must have Level 3 – Account Admin permissions in InEight Platform or a role with the applicable permissions in Engineering.